AssemblyPembroke Pines What Pembroke Pines did.
- Commission approves updated safety rules for senior and community bus servicePembroke Pines adopted updated operating and safety procedures for its Southwest Focal Point transportation services on April 15, with all five commissioners voting yes. The procedures cover senior transportation and seven community bus routes, vehicle inspections, driver training, emergency response and drug testing. The city operates 29 vehicles, and FDOT found the program compliant after resolving findings from its December 2025 review.Apr 15
- Pembroke Pines backs funding application for Pembroke Road upgradesPembroke Pines will seek Broward Metropolitan Organization funding to improve Pembroke Road from Flamingo Road to Hiatus Road. The project would resurface the road, add 6-foot buffered bike lanes, make pavement and marking upgrades, add ADA-compliant curb ramps and widen southbound Hiatus Road near Southwest 15th Street for two left-turn lanes. The City Commission approved the support on Aug. 5, 2026, by a 5-0 vote. The city would pay upfront project costs and seek reimbursement through the Local Agency Program.Aug 5
- $767,331 Silver Lakes North Park playground contract approvedThe City Commission approved a contract with PlayCore Wisconsin Inc., doing business as GameTime, to replace playground equipment and install outdoor fitness equipment, safety surfacing, site accessories and related services at Silver Lakes North Park, 2300 NW 172nd Avenue. The contract caps city payments at $767,330.84, including $15,782.50 for payment and performance bonds. Work must begin within 10 days of a city notice to proceed and finish within 60 days. Commissioners approved it 5-0 on June 17, 2026.Jun 17
- City prepares bid for five-year Building Department operations contractPembroke Pines is preparing to seek proposals for a five-year contract to operate the Building Department, with one possible five-year renewal. The selected firm would handle permits, plan reviews, inspections and customer service, while the city would retain oversight and could provide the chief building official and operations manager under one option. The City Commission is scheduled to review the revised solicitation at an Aug. 5 workshop, with advertising planned for Sept. 8 and proposals due Nov. 3. No firm has been selected.Aug 5
- Commission approves $84,199 utility repair agreementThe City Commission approved a utility repair agreement with Jackson Land Development, LLC for water and wastewater infrastructure work across Pembroke Pines. The city may pay up to $84,199 for completed, inspected and approved services through Dec. 1, 2026. The work includes emergency and planned repairs, with the contractor providing labor, equipment and materials as needed.Sep 16
- City approves $286,345.82 Cisco network equipment purchasePembroke Pines approved a $286,345.82 purchase of Cisco network equipment from Netsync Network Solutions Inc., the lowest bidder among 18 vendors. The equipment will replace end-of-life systems at City Center and includes two Nexus 9504 chassis bundles, related components, four optical transceivers and three years of support. The City Commission approved the award on Aug. 5, 2026, by a 5-0 vote.Aug 5
- $340,745 design package approved for Memorial Park improvementsPembroke Pines approved a $340,744.70 professional-services package for improvements at Memorial Park, 601 City Center Way. Saltz Michelson Architects will lead architectural design, with structural, electrical, geotechnical, civil and landscape consultants supporting planning, permitting and bidding. Planned features include expanded green space, a splash pad, playground improvements, paths, shade, lighting, signage and event infrastructure. The City Commission approved the package May 20, 2026, by a 5-0 vote.May 20
- Senior center energy assistance contract amended without changing fundingPembroke Pines’ Southwest Focal Point Senior Center will continue providing emergency home energy assistance for older adults under an amended contract with the Areawide Council on Aging of Broward County. The amendment updates contract terms and replaces an attachment for July 1, 2025, through June 30, 2026, without changing total funding. The City Commission approved it June 3, 2026, by a 5-0 vote.Jun 3
- City extends community redevelopment grant administration through August 2026The City Commission approved an amended extension keeping Community Redevelopment Associates of Florida, Inc. as the city's grant administrator for community redevelopment projects through August 31, 2026. The extension starts May 31, after the current term ends May 30. The commission passed the amended approval with 10 aye votes.May 20
- $277,325 added to water plant contract for diesel tank replacementsPembroke Pines approved a $277,324.92 increase to Edwards Electric Corp.’s water treatment plant electrical renovation contract. The added work will replace the plant’s bulk diesel and day diesel tanks at 7960 Johnson Street, raising the contract total from $4,248,950 to $4,526,274.92. The City Commission approved the amendment June 17, 2026, by a 5-0 vote.Jun 17
- City awards $165,313 Great Hall epoxy replacement contractThe City Commission approved a contract with The Epoxy Pros LLC to replace about 25,000 square feet of epoxy flooring in the Great Hall of Charles F. Dodge City Hall at 601 City Center Way. The city will pay up to $165,312.50, including a $14,375 contingency and $7,187.50 for payment and performance bonds. Work is scheduled for Thursday evenings through Sundays from July 30 through Aug. 30, 2026, with completion required by Aug. 30.Jun 17
- City vacates old utility easement at Walmart SupercenterThe City Commission approved Walmart Stores East LP’s request to vacate an old utility easement at 151 SW 184th Avenue. The 1999 easement covered utility infrastructure that was redesigned and replaced by a newer easement during the Walmart Supercenter redevelopment. Commissioners approved the vacation on Aug. 19, 2026, by a 5-0 vote, and directed the City Clerk to record it in Broward County public records.Aug 19
- Pembroke Pines faces $47,360 first-year share of new stormwater permit dealBroward County is asking Pembroke Pines and 26 other local governments to approve a new five-year arrangement for stormwater permit work. The county would coordinate required testing, reporting, inspections and other technical services, while Pembroke Pines would continue local drainage inspections and cleaning. The city’s payment would be $47,360 for the first year, rising 2.5% annually to $52,277 in the fifth year. The city had not yet approved the arrangement in the provided material.Jun 17
- School boards must report on middle and high school start timesThe City Commission approved a measure on middle and high school start-time compliance reports. District school boards must send Florida's education department a report by June 1, 2026, listing school start times, strategies considered, public input, financial effects and unintended consequences. Charter school governing boards may file reports for individual charter schools.May 20
- Commission approves $196,216 Cisco network support purchasePembroke Pines commissioners approved a $196,215.78 purchase from Netsync for Cisco Smartnet support and DNA network subscriptions. The package covers routers, switches, wireless controllers, access points, servers, security equipment and related licenses, with service periods running into January 2027. The commission approved it 5-0 on Jan. 21, 2026.Jan 21
- Pembroke Pines schedules September budget and fire assessment hearingsPembroke Pines plans its 2026-27 budget hearings for Sept. 3 and Sept. 16, with a fire assessment hearing on Sept. 14. The schedule follows state timing rules, avoids Broward County and School Board meeting dates, and sets Oct. 9 as the deadline to adopt the budget.Jun 3
- Commission backs design and funding of Police-Fire Public Safety ComplexPembroke Pines commissioners approved a resolution supporting the design, construction and funding of a proposed Police-Fire Public Safety Complex. The plan was recommended by the city manager and the Police and Fire departments, which say the complex would provide modern, resilient facilities for public safety and emergency response personnel. Commissioners amended and adopted the resolution on May 26, 2026, by a 10-0 vote.May 26
- Pembroke Pines receives $292,161 for cameras, rescue tools and underwater robotPembroke Pines will receive $292,161 in FY 2024 Urban Area Security Initiative funding for police surveillance cameras, fire-rescue tools and an underwater robot with sonar. The Miami City Commission approved the regional grant agreement on Dec. 11, 2025, by a 5-0 vote.Dec 11
- Pembroke Pines considers Mirtha Rimarachin for advisory board seatPembroke Pines is considering Mirtha E. Rimarachin for an Environmental Advisory Board seat. Her résumé lists more than 20 years of customer service, insurance, office management and technical experience, along with volunteer service through the Citizen Police Academy and Community Emergency Response Team. The source does not state whether the appointment was approved.Aug 19
- $211,470 contract approved to replace Flamingo Park pavilionPembroke Pines approved a $211,470.46 contract with Advanced Recreational Concepts LLC to demolish and replace the pavilion at Flamingo Park, 1900 NW 122nd Terrace. The work must be completed within 120 days after the city issues a notice to proceed. The City Commission approved the award June 17, 2026, by a 5-0 vote.Jun 17
- City ends general employees’ pension plan and adds 401(a) benefitPembroke Pines ended its Retirement Income Plan for general employees effective Sept. 30, 2026, after the City Commission approved the change 5-0 on second and final reading. Benefits were frozen June 30, 2026; eligible active participants received up to 2.25 additional years of service credit, capped at 28 years, and may participate in the city’s 401(a) plan with an employer contribution of up to 25% of base salary starting Oct. 1, 2026. Eligible members may also choose lump-sum payments under the plan’s 2026 election rules.Aug 19
- Pembroke Pines renews OpenGov software for $359,370The City Commission approved a three-year renewal of its OpenGov software agreement from Oct. 1, 2026, through Sept. 30, 2029. The city will pay OpenGov $359,369.52 upfront for budgeting, online budget book, procurement and contract services, $17,980.46 less than annual payments over the renewal term. The vote was 5-0.Aug 5
- City approves conditional $640,000 loan for 80 affordable apartmentsPembroke Pines approved a conditional $640,000 loan commitment to help Housing Trust Group develop 80 income-restricted apartments at 1600 SW 66th Avenue. The project would replace a previously approved but unbuilt plan for eight affordable and 72 market-rate units. Funding depends on the developer receiving state housing tax credits and signing loan agreements with the city. The City Commission approved the action Aug. 5, 2026, by a 5-0 vote.Aug 5
- Commission backs Islamophobia resolution after legal reviewThe City Commission agreed by consensus to move forward with a resolution condemning anti-Muslim bias and Islamophobia. City attorneys said a narrowly written resolution could comply with a new state law taking effect Jan. 1, 2027, because the law does not prohibit recognizing or promoting religious groups. Commissioner Maria Rodriguez requested the legal review after Emgage Florida organizer Adam Abutaa submitted a proposed resolution.Aug 19
- City approves $29,643 monthly Comcast communications orderPembroke Pines approved a 36-month Comcast business communications service order costing $29,642.96 per month and no one-time charge. The services cover internet connectivity, secure network equipment and management, and voice services at city locations, including City Center Way, Pines Boulevard, Sheridan Street and Pembroke Road. The City Commission approved it 5-0 on Aug. 19, 2026.Aug 19
- City seeks firms to run Building Department under proposed 5-year contractPembroke Pines is seeking firms to operate and manage its Building Department, including permit processing, plan reviews, inspections and related customer services. Proposals are due by 2 p.m. Nov. 3, 2026, and will be publicly opened at 2:30 p.m. that day. The city has not selected a contractor; the proposed initial term is five years, with one possible five-year renewal.Sep 3
- City renews well rehabilitation contract for up to $270,000Pembroke Pines approved a one-year renewal of its well rehabilitation agreement with Florida Design Drilling LLC, from Aug. 22, 2026, through Aug. 21, 2027. The city can pay up to $270,000 for additional well work, including a $45,000 contingency. The City Commission approved the renewal 5-0 on Aug. 19.Aug 19
- $131,715 design contract approved for Fire Station 99 remodelThe city approved a $131,715 architecture and engineering contract with RE Chisholm Architects for design and limited construction administration at Fire Station 99, 16999 Pines Boulevard. The remodel will update restrooms, sleeping quarters, kitchen, dining, living and gym areas, plus life-safety systems, lighting, plumbing and hurricane-rated doors and windows. The estimated construction cost is $1.35 million, and construction administration is planned for up to eight months. The City Commission approved the contract 5-0 on Sept. 3, 2026.Sep 3
- Commission approves bidding for three-year Cisco communications renewalThe City Commission approved staff proceeding with a competitive bid to renew Pembroke Pines’ Cisco Collaboration Flex Plan for three years. The subscription would cover Webex, calling, contact center, webinars, cloud meetings, licensing and Cisco support for city operations. The estimated cost is $265,000 annually, and bids are due Sept. 8, 2026.Aug 19
- City approves $240,000 turf replacement bid for three charter schoolsPembroke Pines approved seeking bids to replace artificial turf at West Campus, FSU Campus and Central Campus Charter Schools. The estimated project cost is $240,000, with about 47,700 square feet of turf to be removed and replaced. Bids are due Oct. 6, 2026, and work is planned for winter break, from Dec. 18, 2026, through Jan. 4, 2027. The City Commission approved the action Sept. 3 by a 5-0 vote.Sep 3
- $596.7M budget proposed with lower millage and higher fire assessmentPembroke Pines is proposing a $596.7 million budget for fiscal year 2026-27, with equal revenues and expenditures across all funds. The plan includes lower property-tax and debt-service millage rates, a higher residential fire assessment, $10.4 million in general-fund capital projects and $14 million in utility capital work. Public hearings are scheduled for Sept. 14 and Sept. 16, 2026.Sep 3
- Kimley-Horn approved to design backup power for five charter campusesThe City Commission approved a professional-services agreement with Kimley-Horn to design generator backup power and mini-split air conditioning for 39 IT and telecom rooms at five Pembroke Pines charter-school campuses. The work covers Academic Village, Central, East, FSU and West campuses. Design fees total $165,165, with up to $68,695 more for permitting, utility coordination, bidding and construction-phase services. Commissioners approved it 5-0 on Sept. 3, 2026.Sep 3
- Auditors propose 10-project, $312,550 internal audit planForvis Mazars assessed Pembroke Pines’ internal controls, permitting process and utility billing, and proposed the city’s FY2026 audit plan. Auditors found 36 of 37 prior recommendations fully implemented, no significant city-caused permitting delays, and no tested inaccuracies in meter readings or billing calculations. The proposed plan covers 10 projects, including procurement, fleet management, budgeting, permitting, utility billing and follow-up work, with 1,330 estimated hours at a total cost of $312,550.Sep 3
- Police ammunition purchases total $385,754 after 5-0 approvalThe Pembroke Pines Police Department will buy ammunition from Lawmen’s & Shooters’ Supply for $385,753.95 after the City Commission approved the purchase 5-0 on Sept. 16. The orders include 9mm, 5.56mm rifle ammunition and 12-gauge training shells for police operations, SWAT and training. The invoices list 48% discounts under Florida’s defense-products contract.Sep 16
- Pembroke Pines renews Broward College dual enrollment for 2026-28Pembroke Pines approved a new dual-enrollment agreement with Broward College for charter high school students for 2026-28. Eligible students can earn high school and college credit through courses at Broward College, online or at the charter school. The charter school will pay Broward College tuition and course fees and cover instructional materials, while students remain exempt from those charges.Sep 16
- Advisory boards report zoning, school and arts work to city commissionersPembroke Pines advisory boards reported their 2024-25 work to city commissioners. The reports cover economic development, zoning, education, youth programs, charter schools, arts and culture, and residential variance requests. The Board of Adjustment heard 94 requests involving 41 properties, approving 84 motions and failing 10; the reports also describe events, school programs, planning applications and recommendations for future city action.Jun 4
- City approves environmental support for flood, stormwater and road workThe city approved environmental consulting support for flood-insurance recertification, stormwater permit reporting and the Pembroke Road Extension. The consultant will prepare FEMA Community Rating System materials, review elevation certificates, submit NPDES reports, coordinate environmental permits and help acquire land and wetlands mitigation. Commissioners approved the action 5-0 on Feb. 5, 2020. The agreement lists hourly rates and reimbursable expenses at 1.25 times cost, but no total contract amount is provided.Feb 5
- $150,000 federal grant funds Pembroke Pines watershed planPembroke Pines will receive up to $150,000 in federal hazard-mitigation funding to develop a watershed master plan. Florida Atlantic University will perform the planning and flood-modeling work under a city task order, with city staff reviewing the plan and the City Commission approving the final plan. The City Commission approved the grant on May 3, 2023, by a 5-0 vote.May 3
- $302,419 approved for Pembroke Pines homebuyer assistancePembroke Pines will receive $302,419 in Broward County HOME funds for a homebuyer assistance program serving income-eligible households. The program will provide up to $75,000 per household for down payments, closing costs or principal reduction, with a minimum of two households targeted. The City Commission approved the agreement on Aug. 5, 2026, by a 5-0 vote.Aug 5
- $167,841 learning software and materials purchase approved for five schoolsPembroke Pines approved a $167,840.50 purchase from Curriculum Associates for i-Ready assessment and personalized instruction, Teacher Toolbox materials, reading resources and professional learning for five schools. The purchase covers schools serving grades K-8 and includes a $18,596.05 discount. The City Commission approved it June 17, 2026, by a 5-0 vote.Jun 17
- Commission advances ballot measure on city manager appointment and removalThe City Commission passed a first reading 3-2 on May 6 to place a charter amendment on the November 2026 ballot. The proposal would lower the commission vote needed to appoint or remove the city manager or acting city manager from four-fifths to three-fifths, with a four-fifths vote required for removal for cause. On Aug. 5, the commission took no action.Aug 5
- City approves $71,115 ShareFile renewal with New Tech SolutionsThe City Commission approved a $71,115 purchase from New Tech Solutions Inc. for 250 annual ShareFile Premium user licenses. The renewal supports the city’s secure file storage and sharing platform for staff and external partners. Commissioners approved it 5-0 on Dec. 11, 2025.Dec 11
- $197,935 approved for new monument-sign designs at 34 parksPembroke Pines approved a $197,935 work order for Miller Legg & Associates to design a unified park monument-sign system for 34 city parks. The consultant will inventory existing signs, develop design concepts, prepare construction documents and provide preliminary permitting assistance. Design work is planned from June through December 2026, with no sign installation included.May 20
- Commission approves steps to end general employees’ retirement planThe City Commission approved authority for the Investment Committee to choose a group annuity provider and for the City Manager and Finance Director to transfer assets and complete the termination of the Retirement Income Plan for general employees. The city must complete the required actions by Sept. 30, 2026. The vote was 5-0 on Sept. 16, with all commissioners voting yes.Sep 16
- $381,848 Trane contract approved to overhaul City Center chillerPembroke Pines will pay Trane up to $381,848 to repair and overhaul Chiller #1 at Charles F. Dodge City Center, including compressor work and replacement of a failed adjustable-frequency drive. The City Commission approved the agreement June 17, 2026, on a 5-0 vote. The price includes $90,000 for contingency work and $4,313 for payment and performance bonds.Jun 17
- Pembroke Pines approves $1.07M plan for housing, seniors and facilitiesPembroke Pines approved its 2026 Community Development Block Grant plan and will seek $1,070,664 from HUD. The plan directs $348,032 to home repairs, $160,599 to senior transportation, $347,900 to public facilities and infrastructure, and $214,133 to administration and fair-housing services. The City Commission adopted it June 17, 2026, by a 5-0 vote and authorized the city manager to submit it to HUD.Jun 17
- Commission approves new Forvis Mazars rates and auditor designeeThe City Commission approved a fifth amendment with Forvis Mazars, LLP, the city's Commission Auditor, changing hourly rates for fiscal year 2026 and replacing Dan O'Keefe with Christie Clements as the firm's designee beginning Jan. 1, 2026. The rates take effect Oct. 1, 2025, while the agreement continues through July 31, 2030. The amendment passed 5-0 on Jan. 21, 2026.Jan 21
- Fire Rescue approved to buy up to $226,500 in supplies from BSOPembroke Pines approved up to $226,500 for Fire Rescue to buy medical supplies and equipment from the Broward Sheriff's Office for fiscal year 2024-25. The purchase has no administrative fees, markup pricing or shipping charges. The City Commission approved it 5-0, with the money covering supplies, non-capital equipment and pharmaceuticals that BSO carries; the department will use regular purchasing for unavailable items.Oct 15
- Board approves Mindset Connect school and several property changesThe Planning and Zoning Board approved a variance and site plan for Mindset Connect to operate a school for up to 120 students at 1700 NW 98 Avenue, using space inside Faith Presbyterian Church. The board also approved three Dutch Bros Coffee variances at 8579 Pines Boulevard, a Broward County Tax Collector expansion at 3 SW 129 Avenue, and three smaller commercial property updates. The board voted 4-0 or 5-0 on each listed action, with Alternate Member Jones voting; the Mixed Use Development code change advanced on a 4-1 vote and still needs City Commission review.Sep 10
- Charter school approves 2025-26 educator training catalogPembroke Pines-Florida State University Charter Elementary School approved the Panhandle Area Educational Consortium’s 2025-2026 professional learning catalog for its staff. The catalog covers training in student conduct, classroom management, literacy, English learners, special education, technology, instructional leadership and other topics. The City Commission approved the action 5-0 on Dec. 11, 2025.Dec 11