AssemblyPittsburgh What Pittsburgh did.
- Animal Care software contract extension would add $75,238Pittsburgh’s Department of Public Safety wants to extend its Petlogix records-management software contract with Open Innovation Plans for Animal Care & Control. The extension would add $75,237.50, bringing the 10-year contract total to $206,930.42 through 2030. City Council referred the proposal on Oct. 13, and standing committees affirmatively recommended it on Oct. 21; no final council vote is listed.Oct 13
- Hamilton Avenue convent renovation advances through sewage-plan reviewCenter That CARES plans to renovate the former convent at 7119 Hamilton Avenue into residential apartments, including one ADA-accessible unit. The project would use one sewer connection and is expected to reduce stormwater flow on the site. Council referred the sewage-plan revision on Oct. 13 and its standing committees recommended passage on Oct. 21; no city money is involved.Oct 13
- City considers gas-line easement through city-owned parcelPittsburgh officials are seeking approval to let Columbia Gas of PA/MD Inc./NiSource and the Frieda Rohn Living Trust install and maintain a gas line through city-owned parcel 16-K-17. City Council read and referred the proposal on Oct. 13, and standing committees affirmatively recommended passage on Oct. 21. The fiscal statement lists no city cost or revenue impact.Oct 13
- Pittsburgh approves $8,947 for graffiti-removal equipmentPittsburgh will pay PPW Industrial up to $8,946.90 for equipment to remove graffiti across the city. City Council approved the one-time, unbudgeted purchase using a trust fund, and the mayor signed it on Oct. 21.Oct 13
- Finance seeks $11,470 for two Windows 11 PCsThe Finance Department is asking City Council to approve a one-time payment of up to $11,470 to OPEX Corporation for two Windows 11-enabled FALCON PCs. The purchase is not budgeted and would use operating funds. Council read and referred the request on Oct. 13, 2026; no vote has been recorded.Oct 13
- Council approves sewer plan for 23 Smallman Street townhomesCity Council approved a plan revision for Smallman Holdings I LLC’s 23-townhome development in the 3100 block of Smallman Street. The project will convert existing warehouse buildings into 12 four-bedroom and 11 three-bedroom townhomes, served by a private sewer main connecting to Pittsburgh Water’s system. The city will incur no cost. Council passed the resolution 9-0 on Oct. 20, 2026.Oct 6
- Pittsburgh seeks grants for parks, roads, housing and public safetyPittsburgh departments have submitted 36 grant applications seeking funding for parks, roads, public safety, housing, technology and emergency services. Requests include $50 million for the Swindell Bridge, $25 million for Butler Street through a joint application with the county, and $14 million each for Spring Hill hillside stabilization and landslide remediation. Council received and filed the weekly grants update on Oct. 20, 2026; the applications remain at various submitted or under-consideration stages.Oct 20
- Homewood Park design contract grows by $25,679 for schedule extensionPittsburgh will add $25,678.75 to Studio Zewde’s Homewood Park contract for construction administration work after the project schedule extended beyond June 2026. The amendment brings the total city cost to $2,162,761.05 and was approved by City Council on Oct. 20, 2026, with 9 votes in favor.Oct 6
- Acting pay extension approved for Kathleen CottomKathleen Cottom will continue receiving acting pay under an extension approved by the Mayor’s Office and the Office of Management and Budget. City Council received and filed the request on Oct. 20.Oct 20
- City approves up to $25,000 settlement with Barbara KleinPittsburgh will pay Barbara Klein and her attorneys up to $25,000 to settle litigation in Allegheny County Court of Common Pleas case G.D. 23-5186. The payment will come from the operating budget over one year, with no impact on city revenue. City Council passed the resolution 9-0 on Oct. 20.Oct 6
- Bridge inspection contract rises by $350,021 for Charles Anderson projectPittsburgh will increase SAI Consulting Engineers’ contract for construction management and inspection on the Charles Anderson Bridge project to $3,204,206.96. The $350,020.85 increase is federally reimbursable at 100% through FHWA capital funds. City Council passed the amendment 9-0 on Oct. 20.Oct 6
- Council approves sewage plan for 11 apartments at 733 N. Highland AvePittsburgh City Council approved a sewage-plan revision for Costello Properties LLC’s proposed apartment development at 733 N. Highland Ave. in Highland Park. The project would convert two existing buildings and construct a new six-unit building, creating 11 residential units on one parcel. The plan received 9-0 final approval on Oct. 20 and will go to the Pennsylvania Department of Environmental Protection for approval. The city reports no cost or new operating expense.Oct 6
- City Steps funding cut to $8.2M under amended PennDOT agreementPittsburgh will amend its PennDOT reimbursement agreement for construction costs on the City Steps Project, lowering the reimbursable amount to $8.217 million and the city's share of Commonwealth-incurred costs to $20,000. City Council passed the measure 9-0 on Oct. 20, 2026.Oct 6
- Pittsburgh accepts $800,000 grant for a new pumper fire truckPittsburgh will accept an $800,000 Pennsylvania grant to help buy a new pumper fire truck, replacing part of the city's aging fleet. The grant requires no local match and will be spent once. City Council passed the measure 8-0, with one member out of the room, on Oct. 13.Sep 29
- EMS medical direction contract recommended at $50 for five yearsPittsburgh’s Department of Public Safety plans to continue paying the Center for Emergency Medicine of Western Pennsylvania for medical direction and physician response services for the Bureau of Emergency Services. The five-year agreement would cost $50 total, with $10 budgeted each year from 2027 through 2031. City Council read and referred the proposal on Oct. 6, and standing committees affirmatively recommended it on Oct. 14; no final council vote is listed.Oct 6
- Parks and Recreation approved for $52,008 soccer grantPittsburgh Parks and Recreation can accept up to $52,008 from the United States Soccer Foundation for soccer programming over two years. The grant includes $33,000 in cash, 400 soccer balls, 400 jerseys and field equipment. City Council passed the measure 8-0, with one member out of the room, on Oct. 13.Sep 29
- Pittsburgh approves $25,000 legal contract for infrastructure advicePittsburgh will pay Racunas Law Group up to $25,000 over one year for legal consultation on transportation and infrastructure issues. City Council approved the contract Oct. 13 by an 8-0 vote, with one member out of the room. The Law Department used an Office of Management and Budget waiver instead of a competitive process.Sep 29
- Pittsburgh approves 23 more on-call professional services agreementsPittsburgh approved 23 additional open-end professional services agreements, bringing the citywide total to 119. The agreements let city departments hire qualified vendors for on-call services as needed, with each agreement capped at $1.5 million annually for three years. The council amended and passed the measure on Oct. 13 with eight votes in favor and one member out of the room.Sep 29
- Pittsburgh approves $85,000 settlement in Luffey lawsuitPittsburgh will pay $85,000 over one year to settle Luffey v. City of Pittsburgh. The city will issue two warrants using budgeted operating funds, with $68,000 from one account and $17,000 from another. City Council passed the settlement 8-0, with one member out of the room, on Oct. 13.Sep 29
- Council adds professional-services agreements for city departmentsPittsburgh City Council amended and passed a resolution adding professional-services agreements for city departments. The fiscal statement says the city will have 119 open-end agreements, each capped at $750,000 annually for three years. Services will be provided on call under contracts funded through operating budgets. Council passed the amended resolution on Oct. 13, 2026, with eight members voting yes and one out of the room.Sep 29
- Pittsburgh approves $200,000 artist-in-residence project downtownPittsburgh will receive up to $100,000 from the Pennsylvania Council of the Arts and provide a $100,000 city match to hire an artist-in-residence consultant. The consultant will coordinate art installations with city partners in the Central Business District. City Council amended and passed the measure finally on Oct. 13, 2026, by a vote of 8-0, with one member out of the room.Sep 29
- Pittsburgh approves $300,000 zoning code overhaul planPittsburgh will seek up to $150,000 from Pennsylvania's Municipal Assistance Program to overhaul the city's zoning code and map and remove restrictive barriers. The city will provide a matching $150,000 from its operating budget, bringing the proposed project total to $300,000. Council passed the measure 8-0, with one member out of the room, on Oct. 13.Sep 29
- Controller certifies 2027 revenue projections with warnings about fund transfersController Rachael Heisler certified Pittsburgh’s projected 2027 revenues as reasonable but warned that the city’s finances remain strained. She said the General Fund spent $44.7 million more than it received in 2025 and expects a similar result in 2027 after expenses are finalized. Heisler recommended limiting 2027 transfers to the Housing Opportunity Fund and Stop the Violence Trust Fund, while keeping the current pension funding formula. City Council received and filed the certification on Oct. 6.Oct 6
- Homewood Park Pool to get two lifeguard chairs for $5,849Pittsburgh will pay Recreonics $5,849.31 for two recycled-plastic lifeguard chairs with side steps at Homewood Park Pool. City Council approved the one-time payment on Oct. 13, 2026, by an 8-0 vote among members present; one member was out of the room. The purchase is funded through a trust fund and was not budgeted.Oct 6
- City tracks dozens of grant requests, including $50M for Swindell BridgeCity departments are pursuing at least 39 grant applications and have received awards for Fort Pitt Park and Brilliant Line Trail Connectivity. Requests range from $15,000 for EMS support to $50 million for Swindell Bridge work; many applications remain submitted or under consideration. Council received and filed the weekly grants update on Oct. 13.Oct 13
- Pittsburgh departments report $88,113 in second-quarter travelPittsburgh departments reported 83 second-quarter travel entries totaling $88,113, including conferences, training, hearings and work-related trips. Police travel accounted for $41,098, while Community, Recreation and Environmental Services reported $10,688 and Mobility and Infrastructure reported $10,037. City Council received and filed the report on Oct. 6.Oct 6
- $787,500 grant will cover firefighters’ training overtimePittsburgh firefighters will use a $787,500 federal grant and city match to cover overtime for training on fire apparatus and vehicles. The grant provides $715,909.09, with $71,590.91 from the fire operating budget. City Council read and referred the matter on Oct. 6 and standing committees affirmatively recommended it on Oct. 14.Oct 6
- Rea Price's acting budget director term extended through Jan. 7Pittsburgh extended Rea Price's acting term as director of the Office of Management and Budget by 90 days, through Jan. 7, 2027. City Council passed the resolution 9-0 on Oct. 6, and Mayor Corey O’Connor signed it Oct. 7.Oct 6
- Pittsburgh approved $5.1M PennDOT winter road maintenance agreementPittsburgh will provide winter maintenance on designated PennDOT state highways, bridges and approaches under a five-year agreement worth up to $5,094,919.20. City Council approved the agreement Oct. 13 by an 8-0 vote, with one member out of the room.Oct 6
- $168,950 plan would provide life monitors to regional fire departmentsPittsburgh plans to spend $168,950 on Immediate Dangerous to Life or Health monitors for its firefighters and smaller regional fire departments. A $153,590.90 federal Assistance to Firefighters grant will cover most of the cost, with $15,359.10 from the city’s fire operating budget. City Council referred the proposal on Oct. 6, and standing committees affirmatively recommended passage on Oct. 14.Oct 6
- Pittsburgh pursues grants for bridges, parks, safety and housingPittsburgh departments are pursuing at least 40 grants for transportation, parks, public safety, housing and other projects. Requests include $50 million for Swindell Bridge, $25 million for Butler Street safety improvements and $14 million each for Spring Hill hillside stabilization and landslide remediation. Two FEMA grants totaling $869,500 were awarded for fire department training and air-monitoring equipment. City Council received and filed the update on Oct. 6, 2026.Oct 6
- Public Safety receives 132 Narcan kits from Allegheny CountyPittsburgh's Department of Public Safety will receive 132 Narcan kits from the Allegheny County Health Department to help reverse opioid overdoses. The kits are valued at $4,616.04. City Council received and filed the donation on Oct. 13, 2026.Oct 13
- 2026-0813: Communication from Rea Price, Acting Director of the Office of Management and Budget, submitting to City Council the attached status update from the Grants Office for the week ended August 28, 2026.The update lists Pittsburgh’s active, awarded, and potential grant-funded projects as of August 28, 2026. Applications span transportation, parks, public safety, environmental work, housing, and technology. Awarded grants include Boulevard of the Allies renovations, West End mobility improvements, traffic-signal upgrades, and water-fountain and ballfield projects. Pending requests include up to $50 million for Swindell Bridge, $25 million for Butler Street safety improvements, $14 million for Spring Hill hillside stabilization, and $10 million for housing initiatives. Projects are led by city departments, often with state, federal, county, or nonprofit partners, and may require matching funds ranging from 10% to 50%. The report matters because it shows how Pittsburgh seeks outside funding for public infrastructure and services, while identifying financial commitments, deadlines, and projects still awaiting decisions.Aug 28
- 2026-0814: Communication from Rea Price, Acting Director of the Office of Management and Budget, submitting an acting pay request on behalf of the Office of Management and Budget for Kathleen Cottom and the Department of Innovation and Performance for Alexis Barone-Katze.The City of Pittsburgh Department of Innovation & Performance requested temporary acting pay for Alexis Barone-Katze, currently a Business Relationship Manager, to perform the duties of Senior Manager, Innovation. The assignment is scheduled for September 3 through November 25, 2026, under the City’s Acting Pay Policy, which permits temporary advancement when urgent decisions require immediate coverage. Her salary would increase from $86,008 in pay grade 25G to $101,525 in grade 29G during the assignment. The request requires approval from the Office of Management and Budget and the Mayor’s Office, affecting city payroll and the employee’s compensation.Aug 28
- 2026-0816: Resolution authorizing the issuance of a warrant in favor of Bucks County Community College in an amount not to exceed THIRTY-ONE THOUSAND SEVEN HUNDRED FIVE DOLLARS AND NO CENTS ($31,705.00), for rescue certification and training for the Bureau of Emergency Medical Services.The document is a proposed $16,280 service agreement between the City of Pittsburgh Bureau of EMS and Bucks County Community College. The college would provide instruction, testing, materials, administrative services, and national certification for Pittsburgh EMS personnel: eight students in hazardous-materials awareness, vehicle rescue, and rope awareness/operations, plus 48 students in rope technician certification. Testing would follow National Fire Protection Association standards, with successful participants receiving college and National Professional Qualifications Board certificates. Pittsburgh EMS must provide facilities, equipment, standards access, prerequisites, insurance coverage, and payment within 45 days. Written approval is required for scope changes, and either party may terminate with 21 days’ notice for documented noncompliance. The quotation expires September 30, 2027.Aug 28
- 2026-0817: Resolution authorizing the issuance of a warrant payable in favor of Allegheny League of Municipalities for one year membership dues in an amount not to exceed NINE THOUSAND DOLLARS and ZERO CENTS ($9,000.00).The proposed City of Pittsburgh resolution would authorize a $9,000 payment to the Allegheny League of Municipalities for the City’s 2026 annual DIRECT membership dues. The invoice, dated January 1, 2026, is payable upon receipt, and the payment would be made by warrant from City funds. The legislation affects the City government and its budget rather than individual residents directly. Membership indicates the City’s participation in a regional organization representing municipalities, though the document does not describe specific services or benefits. The measure matters because City Council approval is required to authorize the expenditure and make the payment publicly accountable through the legislative process.Aug 28
- 2026-0819: Resolution adopting Plan Revision to the City of Pittsburgh’s Official Sewage Facilities Plan for 2225 Smallman Street, Pittsburgh PA 15222, at no cost to the City.The document is a Pennsylvania sewage-facilities planning submission for Building A of the Brickworks residential development at 2225 Smallman Street in Pittsburgh’s Strip District. MI Strip Works, LLC proposes 130 apartments on a previously paved parking lot, generating an estimated 25,950 gallons of wastewater daily. The building would connect to Pittsburgh Water’s existing sewer system, with treatment ultimately at ALCOSAN’s Woods Run facility. The City of Pittsburgh reviewed the proposal through its Department of City Planning, while the Allegheny County Health Department recommended approval. The submission also documents historic-resource review, environmental screening, sewer-capacity analysis, and a $3,250 DEP review fee. The PNDI review found no anticipated impacts from some agencies but requires further review concerning fish, mussels, bats, and federally protected freshwater species. This matters because municipal and state review helps confirm sewer capacity, regulatory compliance, environmental protections, and opportunities for public oversight before construction.Aug 28
- 2026-0820: Resolution adopting Plan Revision to the City of Pittsburgh’s Official Sewage Facilities Plan for 132-134 Prospect Street, Pittsburgh, PA 15211, at no cost to the City.The document records government review of a proposed two-unit duplex at 132–134 Prospect Street in Pittsburgh. The project is expected to generate 800 gallons of sewage per day, collected by the Pittsburgh Water and Sewer Authority, conveyed through the Saw Mill Run Interceptor, and treated by ALCOSAN. The Allegheny County Health Department reviewed the sewage facilities plan from July 13 to July 22, 2026, and recommended approval, while noting that separate plumbing permits and pipe specifications are still required. Pittsburgh’s Department of City Planning reviewed the plan July 28–29, citing a zoning variance and amendment review under BDA-2024-02439. The records show how county and city agencies coordinate approvals and publicly document infrastructure, zoning, and environmental review.Aug 28
- 2026-0821: Resolution adopting Plan Revision to the City of Pittsburgh’s Official Sewage Facilities Plan for 630 North Aiken Avenue, Pittsburgh, PA 15214, at no cost to the City.The document is a Pennsylvania sewage facilities planning module for Hope Ignites Pittsburgh, a proposed youth home at 630 North Aiken Avenue in Pittsburgh’s 11th Ward. The project would consolidate three parcels and construct housing with 10 student units and two supervisor units, generating an estimated 2,400 gallons of wastewater daily. Sewage would enter Pittsburgh Water’s existing gravity sewer, flow through the Allegheny River Interceptor, and receive treatment at ALCOSAN. Capacity calculations indicate the system can accommodate the added flow. Allegheny County Health Department recommends approval, but plumbing permits and separate approval of pipe sizes are required. No wetlands are identified; state agencies found no known impacts, while federal review is required because Indiana bat habitat may be affected, particularly by tree disturbance.Aug 28
- 2026-0822: Resolution authorizing the Mayor of the City of Pittsburgh, and the Office of Management and Budget to apply for a grant from Pennsylvania Department of Economic Development’s Multimodal Transportation Fund for the Renovation of the Boulevard of the Allies in the Central Business District. The grant proposal includes an ask not to exceed THREE MILLION ($3,000,000.00) dollars for this stated purpose.The proposed resolution would authorize Pittsburgh’s Mayor and Office of Management and Budget to apply for up to $3 million from the Pennsylvania Department of Economic Development’s Multimodal Transportation Fund. The requested grant would support renovation of the Boulevard of the Allies in the Central Business District. The measure primarily affects city government by permitting submission of the funding application; it does not itself award funds or begin construction. If approved and funded, the project could support transportation-related improvements in a major downtown corridor. City Council’s consideration is required before the application proceeds.Aug 28
- 2026-0823: Resolution authorizing the Mayor of the City of Pittsburgh, and the Office of Management and Budget to apply for a grant from Pennsylvania Department of Economic Development’s Multimodal Transportation Fund for the Sheraden Station Plaza Intersection Safety Improvement and the Wabash Street Community Connector projects. The grant proposal includes an ask not to exceed ONE MILLION ONE HUNDRED TWENTY TWO THOUSAND NINE HUNDRED NINETY SIX ($1,122,996.00) dollars for this stated purpose.The proposed resolution would authorize Pittsburgh’s Mayor and Office of Management and Budget to apply for up to $1,122,996 from the Pennsylvania Department of Community and Economic Development’s Multimodal Transportation Fund. The funding would support two projects: intersection safety improvements at Sheraden Station Plaza and the Wabash Street Community Connector. The measure primarily affects city officials responsible for pursuing and administering the grant, while benefiting residents, pedestrians, cyclists, transit users, and drivers who use these areas. Approval would allow the City to seek state funding for transportation safety and connectivity improvements; it does not itself guarantee that the grant will be awarded or establish final construction plans.Aug 28
- 2026-0824: Resolution approving the recommendation made by the Director of the Department of Mobility and Infrastructure that the concrete portion of Fernhill Avenue from Belbrook Street to Elmbank Street should be paved with asphalt in accordance with Section 417.06 of the Pittsburgh Code of Ordinances.The Department of Mobility and Infrastructure submitted a proposed resolution to Pittsburgh City Council concerning Fernhill Avenue. It recommends converting the concrete section between Belbrook Street and Elmbank Street to asphalt pavement, pursuant to Section 417.06 of the Pittsburgh Code of Ordinances. If approved, the resolution would authorize the paving change and affect this specific city roadway and its users, including nearby residents, pedestrians, cyclists, and drivers. The document requests Council’s favorable consideration but does not itself approve or schedule construction. Director Jeff Skalican signed the request on August 21, 2026, following departmental review.Aug 28
- 2026-0825: Resolution providing for an amended agreement with CSXT Transportation, Inc. for Preliminary Engineering work on the Frazier Street/Swinburne Bridge Replacement Project; and providing for the payment of the costs thereof, not to exceed Thirty-Two Thousand Seven Hundred Eighty Dollars ($32,780.00), an increase of Twelve Thousand Seven Hundred Sixty Dollars ($12,760.00) from the previously executed agreement, reimbursable at 95%.Pittsburgh’s Department of Mobility and Infrastructure asked City Council to approve an amendment to its professional-services agreement with CSXT Transportation, Inc. The amendment covers additional preliminary engineering for the Frazier Street/Swinburne Bridge Replacement Project. It would raise the agreement’s total authorized cost to $32,780, an increase of $12,760, with 95% of eligible costs reimbursable. The legislation affects the City, CSXT, and public funds allocated to bridge replacement planning. Approval would allow the City to continue engineering work needed to advance the project. The letter was signed by Director Jeff Skalican on August 21, 2026, after internal approvals.Aug 28
- 2026-0826: Resolution authorizing the Mayor and the Director of the Department of Mobility and Infrastructure, on behalf of the City of Pittsburgh, to enter into a supplemental agreement or agreements with CDR Maguire, Inc., for Project Design Management Services and Reviews in connection with various City of Pittsburgh projects to add funding for the Preliminary Engineering phase increasing the total not to exceed to Three Million Nine Hundred Sixty-Eight Thousand Two Hundred Thirty-Seven Dollars and Thirteen Cents ($3,968,237.13), a net increase of Sixty-Seven Thousand Seven Hundred Seventy-Three Dollars and Ninety-Four Cents ($67,773.94), reimbursable at various rates.The Department of Mobility and Infrastructure asked City Council to approve Supplement 14 to the City’s agreement with CDR Maguire, Inc. The amendment would add funding for preliminary engineering, project design management, and review services supporting various City of Pittsburgh projects. It would increase the agreement’s total maximum value by $67,773.94, bringing it to $3,968,237.13. Costs would be reimbursed at varying rates. The proposed legislation authorizes the Mayor and department director to execute the supplemental agreement. It affects the City, CDR Maguire, and projects relying on these engineering services, and matters because it extends technical support and commits additional public funds. The request letter was signed August 18, 2026.Aug 28
- 2026-0827: Resolution authorizing the Mayor and the Director of the Department of Mobility and Infrastructure, on behalf of the City of Pittsburgh, to enter into a supplemental agreement or agreements with CDR Maguire, Inc., for Project Design Management Services and Reviews in connection with various City of Pittsburgh projects to add funding for the Preliminary Engineering and Final Design phases increasing the total not to exceed Four Million Sixty-Four Thousand Eight Hundred Seventy-Six Dollars and Ninety-One Cents ($4,064,876.91), an increase of Zero Dollars ($0.00) from the previously authorized agreement, reimbursable at 100%.The City of Pittsburgh’s Department of Mobility and Infrastructure asked City Council to approve a supplemental agreement with CDR Maguire, Inc. The firm would provide project design management and review services for various federally funded City projects, including preliminary engineering and final design. The proposed authorization sets the agreement’s total maximum value at $4,064,876.91, reimbursed at project-specific rates. Although described as adding funding for design phases, the letter states the amount is a $0 increase from the previously authorized agreement. The legislation would affect the City, CDR Maguire, and federally funded transportation or infrastructure projects by continuing outside technical support and oversight. Approval would authorize the Mayor and department director to execute the agreement.Aug 28
- 2026-0828: Resolution providing for an amended agreement with CSXT Transportation, Inc. for Preliminary Engineering work on the West Carson Street Bridge Project; and providing for the payment of the costs thereof, not to exceed Twenty-Eight Thousand Six Hundred Dollars ($28,600.00), an increase of Twelve Thousand Three Hundred Twenty Dollars ($12,320.00) from the previously executed agreement, reimbursable at 95%.The City of Pittsburgh’s Department of Mobility and Infrastructure asked City Council to approve an amendment to its agreement with CSXT Transportation, Inc. for preliminary engineering work related to rehabilitating the West Carson Street Bridge near CSXT railroad facilities. The amendment raises the agreement’s maximum cost to $28,600, an increase of $12,320, with 95% of eligible costs reimbursable. The legislation affects the City, CSXT, and ultimately bridge users by supporting design and planning needed for the rehabilitation project. It matters because it authorizes additional engineering expenditures while limiting the City’s anticipated share through reimbursement. The request was signed by the department director on August 25, 2026.Aug 28
- 2026-0829: Resolution further amending Resolution No. 886 of 2021, effective December 27, 2021, as amended, entitled “Resolution adopting and approving the 2022 Capital Budget and the 2022 Community Development Block Grant Program, and the 2022 through 2027 Capital Improvement Program” by reducing PARK RECONSTRUCTION - PARKS TA by Ten Thousand Dollars ($10,000.00), and increasing SPORTS FACILITIES by Ten Thousand Dollars ($10,000.00).The proposed resolution would amend Pittsburgh’s 2022 Capital Budget and 2022–2027 Capital Improvement Program, originally adopted through Resolution No. 886 of 2021. It would transfer $10,000 from the “Park Reconstruction – Parks TA” category to “Sports Facilities,” without changing the overall capital budget. The legislation affects the City’s allocation of capital funds for park and sports-related projects and would be implemented through the Office of Management & Budget. The document does not identify a specific project, facility, or neighborhood receiving the funds. Its significance is that it adjusts previously approved spending priorities, directing a modest amount toward sports facilities while reducing funding available for park reconstruction.Aug 28
- 2026-0830: Resolution amending 741 of 2025, which amended Resolution 413 of 2025, which authorized the Mayor and the City Solicitor to enter into a Professional Services Agreement with Block & Associates for legal services in connection with a current City construction project, by further authorizing an amendment to said Professional Services Agreement to amend the scope of work and allocate additional funding for a new not-to-exceed cost of ONE HUNDRED AND THIRTY-FIVE THOUSAND DOLLARS AND ZERO CENTS ($135,000.00) over two (2) years.
(Executive Session held 9/1/26)
(Waiver of Competitive Process Received)The document records the City of Pittsburgh’s approval of a waiver under Ordinance 177.06A for Block & Associates. The firm, identified as women-owned and women-operated, will provide expert consultation to the City Law Department’s litigation team. The waiver was reviewed and approved by the Equal Opportunity Review Commission Department, with notice sent to the City Solicitor and the Mayor’s Office Business Diversity Manager. The document concerns a specific legal-services engagement and does not provide the contract’s value, duration, selection process, or detailed explanation of why a waiver was necessary. Its significance is that it documents the City’s application of an equal-opportunity and contracting-review requirement while making the approval publicly identifiable.Aug 28
- 2026-0831: Resolution amending Resolution 78 of 2026, which authorized the Mayor and the City Solicitor to enter into a Professional Services Agreement with Fisher Phillips, LLP for legal consulting services in connection with labor disputes to amend the scope of work, adjust hourly rates, extend the term, and allocate additional funding in an amount not to exceed ONE MILLION AND TEN THOUSAND FOUR-HUNDRED DOLLARS ($1,010,400.00) over three (3) years.
(Executive Session held 9/1/26)
(Waiver of Competitive Process Received)The document records Pittsburgh’s approval of a waiver from competitive procurement for Fisher Phillips LLP, a management-side labor and employment law firm. The Law Department sought the firm’s ongoing expert advice and consultation on labor disputes and related litigation. The waiver was approved under City Code provisions allowing noncompetitive contracts for counsel or consultants connected to anticipated, pending, or potential litigation, where public solicitation could compromise confidentiality. Procurement and the Chief Solicitor approved the request on February 17–18, 2025. The document notes that City Council must authorize the contract through legislation. This affects the City, its attorneys, and potential competing vendors, while illustrating the review and approval process for exceptions to ordinary bidding requirements.Aug 28
- 2026-0832: Resolution authorizing the Office of the Mayor, on behalf of the City of Pittsburgh, to enter into two-year reimbursement agreements for the 2026 Love Your Block program at a cost not to exceed Twenty Thousand Dollars ($20,000).The proposed resolution would authorize the City of Pittsburgh’s Office of the Mayor to enter into two-year reimbursement agreements for the 2026 Love Your Block program. The agreements would provide up to $20,000 in total City funding. The document does not specify the participating organizations, eligible expenses, or individual award amounts. It asks City Council to approve the agreements so the program can proceed. Love Your Block is referenced as the program receiving support, but the letter provides no further description of its activities or beneficiaries. The legislation matters because it would commit public funds and establish the legal authority for the City to reimburse approved program-related costs.Aug 28