AssemblySt Paul What St Paul did.
- $20.17M bikeway extension and street rebuild planned downtownSt. Paul plans to reconstruct Wabasha, St. Peter, Tenth and Twelfth streets and add an off-street protected bikeway from Wabasha Street to John Ireland Boulevard. Public Works estimates the project at $20.17 million, including $2.16 million in property assessments across 259 parcels. A public hearing is scheduled for December 9, 2026; staff recommend approving the assessments.Nov 4
- Council deletes $157 pallet-removal assessment for 1104 Farrington StreetThe City Council approved deleting a $157 special tax assessment tied to a 2017 pallet-removal order at 1104 Farrington Street. The assessment included $122 in costs and a $35 service charge. The council approved the deletion 6-0, with Council Member Nelsie Yang absent, and the mayor’s office signed it October 31, 2026.Oct 28
- Saint Paul extends Twin Cities Public Television lease through 2038Saint Paul is extending Twin Cities Public Television Inc.'s lease for the downtown Twin Cities Public Television Building by about 12 years, through Oct. 31, 2038. The lease continues without rent, while Twin Cities Public Television remains responsible for property expenses, additional rent and utilities. The City Council approved the extension 6-0, with Nelsie Yang absent, and the Mayor's Office signed it Oct. 31.Oct 28
- HRA receives third-quarter update on 2026 housing and development spendingThe Housing and Redevelopment Authority received a third-quarter update comparing 2026 budgets with actual and projected spending for Planning and Economic Development programs. The update lists the 10 largest funded programs, including $15.89 million for personnel and PED operations, $13.57 million for STAR and $5 million for Downtown Vitality. Staff say the figures are preliminary, estimated and unaudited.Nov 4
- HRA approves bikeway access and utility easements at Smith Avenue rampThe Housing and Redevelopment Authority approved two easements at the Smith Avenue Parking Ramp and Transit Center, 145 N. Smith Ave. A temporary right-of-entry permit will let St. Paul access the property for the Capital City Bikeway’s phase 3 construction along Kellogg Boulevard, planned for 2027-2028. A permanent easement will let District Heat and Energy install and maintain new heating and chilled-water pipes. The HRA approved the action Oct. 28 by a 4-0 vote, with three members absent.Oct 28
- New Heights development park named Koom Siab ParkSaint Paul has named the new 5.34-acre park at The Heights development Koom Siab Park. The park is in Ward 6, District 2, between Winifred and Howard streets and Idaho and Iowa avenues. The name means “to unite,” “come together” and “join” in Hmong, reflecting the Greater East Side’s Hmong community. The City Council approved the name on Oct. 28, 2026, by a 6-0 vote, with Council Member Nelsie Yang absent.Oct 28
- City attorney proposes $16.4M budget with three added positionsThe City Attorney’s Office presented its proposed 2027 budget, which would increase total spending to $16.4 million and add three full-time positions. The plan would invest $556,054 in technology, data-practices staff and a civil attorney, while cutting $213,049 and one paralegal position. The Budget Committee received and filed the presentation on Oct. 28, 2026.Oct 28
- St. Paul extends CAD and mobile data agreement renewal limitThe St. Paul City Council approved an amendment with Ramsey County and other agreement members that allows the CAD and mobile data agreement to renew for up to 12 one-year periods instead of 10. The council passed it on Oct. 28, 2026, by a 6-0 vote, with Council Member Nelsie Yang absent.Oct 28
- Model Cities seeks loan restructuring for University Avenue BROWNstoneModel Cities is seeking to restructure loans tied to the BROWNstone mixed-use building at 837/839 University Avenue, which has 35 affordable rental units and 20,580 square feet of commercial space. The proposed plan would extend the $1.553 million HRA loan, allow up to $650,000 in forgiveness if performance targets are met, forgive $300,000 and $356,000 City loans, and defer a $120,000 STAR loan until 2037. The HRA received and filed the presentation on Oct. 28; the HRA Board and City Council are scheduled to consider approvals Nov. 4.Oct 28
- HRA approves loan changes to preserve 172 affordable units on Maryland AvenueThe Housing and Redevelopment Authority approved the transfer and modification of a $600,000 HOME loan for Maryland Park Apartments at 1619 Maryland Avenue East. The buyer will assume the loan, extend its maturity from 2046 to 2056, and place it behind a new first mortgage. The sale price is $19.3 million, and the 172-unit property will remain affordable at 60% of area median income or less. The HRA approved the action 4-0, with three commissioners absent.Oct 28
- St. Paul extends Ramsey County public safety radio agreementSt. Paul will continue using Ramsey County’s regional 800 MHz public safety radio system under an amended subscriber agreement. The amendment extends the agreement from up to 10 annual renewals to up to 12. The City Council adopted it on Oct. 28, 2026, by a 6-0 vote, with Council Member Nelsie Yang absent. The agreement covers radio purchases, programming, training, maintenance, system access and possible subscriber fees; no specific amount is stated for the amendment.Oct 28
- City seeks $95,086 in vacant-building assessments from 19 propertiesThe city is seeking council consideration of $95,086 in vacant-building assessments for 19 St. Paul properties tied to registration fees from September and October 2025. The charges include $91,970 in vacant-building fees, $2,356 in Department of Safety and Inspections administrative fees and $760 in assessment administration fees. The assessment was completed October 12, 2026, but the source does not state a council vote or final ratification.Nov 11
- Residents appeal denial of seven-foot fence variance on Edmund AvenueReginald Johnson and a co-applicant are appealing the denial of a variance for a fence a little over seven feet tall at 775 Edmund Avenue. The Department of Safety and Inspections rejected the request because it did not meet requirements for building-official approval. A legislative hearing is scheduled for October 27, 2026, with the applicant planning to attend in person.Oct 27
- HRA approves housing tax credits, Afton View waiver and bond authorizationThe Housing and Redevelopment Authority approved reserving 2027 low-income housing tax credits for The Aragon development at 470 White Bear Avenue, with six commissioners voting yes and one absent. The HRA also approved a partial Sustainable Building Ordinance waiver for Afton View Apartments at several addresses on Winthrop Street South and Londin Lane. After a public hearing with no testimony, commissioners approved issuing and selling conduit multifamily housing revenue bonds for Afton View, related documents, a developer-fee policy waiver and a housing program. Staff presentations on parks funding and the Maryland Park property sale and loan assumption were received for information.Oct 26
- Saint Paul approves $6.99M for lead pipe replacementSaint Paul approved up to $6.99 million in taxable grant-anticipation notes for phased lead service line replacement and related project costs. The Minnesota Public Facilities Authority will hold notes totaling $6.81 million and $180,000. Repayment will come from the 2026 grant, with subordinate backing from Saint Paul Regional Water Services net revenues rather than the city's taxing power. The City Council passed the action 5-0, with two members absent, and the mayor's office signed it.Oct 21
- Appeal denied for 242 Charles Avenue vacant-building designationThe mayor's office signed a decision denying Sab Chu-Yang-Heu's appeal for the property at 242 Charles Avenue. The property will remain a Category 2 vacant building and must receive a code compliance inspection, while the city waives its vacant-building fee for 90 days, through Jan. 5, 2027.Oct 21
- Saint Paul approves $10M note for water utility improvementsSaint Paul approved a $10 million water revenue note to help finance improvements to its Water Utility. The note will be issued to the Minnesota Public Facilities Authority, with repayment from Saint Paul Regional Water Services net revenues through 2046. The City Council approved it 5-0, with two members absent, and the mayor’s office signed it on Oct. 25.Oct 21
- 947 Fremont Ave. remains 5% complete before hearingA city building inspector told staff that work at 947 Fremont Ave. remains about 5% complete before a hearing on Oct. 27, 2026. The owner replaced part of the foundation wall, but the inspector says the rebuild may not follow the engineer’s design; no other work has been done.Oct 27
- Council refers 914 Central Ave. W. nuisance property for repair or removalSaint Paul has ordered the owner of 914 Central Ave. W. to repair or remove a vacant, deteriorated house, garage and shed. The property remains a nuisance, and staff estimate repairs would exceed $150,000 while demolition would cost more than $30,000. The City Council referred the matter on Aug. 19, 2026, with six votes in favor and one absence, then laid it over on Sept. 15 for further action. Costs could be assessed against the property.Oct 27
- Asian Flame approved for liquor licenses with parking and closing conditionsAsian Flame LLC at 285 George St. W will receive on-sale and Sunday liquor licenses for its planned seated restaurant, with conditions approved by the City Council 5-0; two council members were absent. The business must close at midnight, clear patrons by 12:30 a.m., screen trash, post a no-blocking sign near 279 George St. W, and lock away alcohol whenever another business uses the premises. Mayor's Office signed the approval on Oct. 25.Sep 23
- Owner of 1141 University Ave. W faces $2,705 vacant-building feeSaint Paul is seeking a $2,705 vacant-building registration fee from the owner of 1141 University Ave. W. The fee was due in August 2025 and had not been paid as of June 11, 2026. The owner has 45 days from the notice to pay or the city may assess the amount to the property's taxes. The building cannot be legally reoccupied until vacant-building requirements are met.Oct 27
- Two properties face $242,746 in energy and sewer repair assessmentsSt. Paul is seeking council approval to assess $242,746.13 in energy-bill and emergency sewer-repair costs to two properties: 180 Mounds Blvd. and 340 Cedar St. The charges include $241,788.13 for summary abatement, plus administrative and attorney fees. The assessment is submitted for council consideration; no vote is recorded.Nov 18
- Council adopts 2027 meeting calendarThe St. Paul City Council adopted its 2027 meeting calendar on Oct. 14, with seven council members voting yes. The mayor's office signed it on Oct. 15. The calendar marks regular meetings, no-meeting dates and observed city holidays.Oct 14
- City secures Prior Avenue building after reported burglaryThe city secured the building at 576 Prior Ave. N. after police responded to a reported burglary and found the west-side door open. The work cost $310, plus $164 in city administration fees. The property owner will receive notice of a $474 assessment and may pay or appeal it.Oct 27
- Turkey Trot gets sound variance for Shepard Road eventMN Run Series and Podium Sports Marketing received approval for a sound variance for the Turkey Trot Saint Paul event on Shepard Road between Washington Street and Sherman Street. Amplified sound may reach 85 dBA at 50 feet from 7:30 to 11 a.m. on Nov. 26, 2026, with a 7 a.m. sound check capped at 80 dBA. The City Council approved the variance 6-0, with Nelsie Yang absent, and the mayor's office signed it Oct. 25.Oct 21
- Council adopts amended autonomous vehicle protections resolutionThe City Council adopted, as amended, a resolution on autonomous vehicle labor and community protections on Oct. 14, 2026, by a 7-0 vote. Saint Paul resident Birch Hansen opposed rules he said could block autonomous vehicle operations and urged safety standards, technical input and worker retraining to be studied separately.Oct 14
- Saint Paul adds enhanced street sweeping with up to $100,000 grantPublic Works will add street sweeping in selected priority areas within the Ramsey-Washington Metro Watershed District during summer and fall 2026. The watershed district will reimburse the city up to $100,000 for actual costs, and the city will report labor, maintenance, disposal costs and collected material by Dec. 31. The City Council approved the agreement 6-1, with Nelsie Yang absent, and the mayor's office signed it Oct. 25.Oct 6
- 14.8% rent increase approved for single unit on Edgerton StreetThe city approved a 14.8% rent increase for the single rental unit at 1640 Edgerton St. after landlord Robert Fox appealed the calculation. Fox sought a 23.12% increase, arguing that $2,400 in last-month's-rent collected in a prior year should not count as 2025 income. The City Council continued the hearing and then adopted the appeal decision unanimously, with seven votes in favor. The mayor's office signed it Sept. 18.Sep 9
- Fire damages Bush Avenue home; city billed $610 for board-up workA fire damaged a single-family home at 2098 Bush Avenue on July 31, 2026, and St. Paul firefighters found major damage originating in the basement near a lithium lawn-mower battery. Crews from St. Paul and Maplewood searched the home, extinguished the fire and secured utilities. The city’s Code Enforcement office is being billed $610 for emergency board-up work covering one door and five windows. The fire was investigated as an arson-type fire, and the Red Cross was requested to help occupants.Oct 27
- Owner gets until Nov. 10 to fix condemned home on Third Street EastThe City Council approved an extension for Paris Getty to bring the condemned home at 855 Third Street East into compliance. Getty must finish the work by November 10, 2026; otherwise, the second floor and any basement tenancy must be vacated, and the city may assess fines. Inspectors found the electrical permit still open, exposed wiring, and a closed staircase. The council approved the extension 5-0, with two members absent, and the mayor signed it October 25.Oct 21
- Yoerg Brewing gets alcohol license with food-service conditionsBear Bluff LLC can sell wine and strong malt at Yoerg Brewing Company, 378 Maria Ave, after the City Council approved the license with conditions on Oct. 21. Alcohol must be served with food, at least 60% of gross receipts must come from food, annual food and liquor receipts must go to the Department of Safety and Inspections, and outdoor alcohol service needs prior approval and additional licensing. The mayor’s office signed the approval Oct. 25. The business has nine employees and is run by co-owners Barry Madore and Jason Padgett.Oct 21
- St. Paul approves $83,938 in vacant-building assessments for 17 propertiesSt. Paul approved $83,938 in assessments for vacant-building registration fees from November and December 2025. The charges cover 17 properties citywide, with individual totals of $2,869 or $5,574, including fees for Department of Safety and Inspections administration and assessment administration. The City Council adopted the assessment 5-0, with two members absent, on Oct. 21; the mayor’s office signed it Oct. 25.Oct 21
- St. Paul can seek federal grant funding for overtime traffic patrolsSt. Paul police can seek federal traffic-safety grant funding for overtime patrols focused on impaired driving, speeding, distracted driving, seat belts and pedestrian safety. The FFY27 grant period runs Oct. 23, 2026, through Sept. 30, 2027, and requires city authorization before an application can proceed. The source does not state whether St. Paul applied for or received funding.Oct 12
- Police foundation approves $22,000 for Honor Guard and women’s conferenceThe Saint Paul Police Foundation approved two donations totaling $22,000 for the Saint Paul Police Department. It will give $10,000 to the Honor Guard and $12,000 for the department’s 2027 Women’s Leadership Conference. The foundation’s Grants Committee and Board of Directors unanimously supported both requests on Sept. 30, 2026.Oct 12
- Technology office proposes $13.2M budget and 75 positions for 2027The Office of Technology & Communications is proposing a $13.2 million 2027 General Fund budget, an $1.0 million increase from 2026, while adding four net positions to reach 75 FTEs. The plan adds three enterprise portfolio governance positions and transfers three GIS positions from Public Works, while eliminating two vacant positions. It also includes $1.0 million in investments, including $451,107 for governance, $449,181 for GIS centralization and $100,000 for the cyber incident after-action plan. The Budget Committee received and filed the proposal on Oct. 21, 2026.Oct 21
- Saint Paul weighs new process and cost rules for honorary street namesSaint Paul’s Policy Committee received and filed a plan to create a citywide process for honorary street co-naming. The proposal would have Planning and Economic Development and Public Works review applications, the Heritage Preservation Commission recommend approvals, and the City Council make final decisions. Honorary names would not change official street names or addresses, and applicants or other non-City sources would pay direct sign costs. Public Works staff said the Heritage Preservation Commission may not be the right reviewing body and recommended limiting signs to four intersections on a continuous street segment.Oct 15
- 37 St. Paul properties face $1,413 in public-improvement assessmentsThe city is preparing $1,413.28 in public-improvement assessments for 37 St. Paul properties. Individual charges range from $4.25 to $199.75, with all parcels listed as pending as of July 27, 2026. The source does not show a ratification date or resolution number.Nov 12
- Public-improvement charges proposed for more than 1,000 St. Paul propertiesThe city is preparing public-improvement assessments for 1,000-plus properties, mostly in Ward 7 and Ward 1, with charges generally between $61.04 and $586.65. The assessments were pending as of July 27, 2026; the source does not show a ratification date or vote. Examples include $293.32 at 1001 3rd St E, $506.07 at 342 Bates Ave and $586.65 at 468 Beaumont St.Nov 12
- Twelve properties face $160 public improvement assessments eachThe city is assessing 12 properties a total of $1,920 for project YW26Q2B2, with each property charged $160. The properties are in Wards 1 through 6, and the assessments were pending as of July 27, 2026.Nov 12
- Council adopts amended plan for unsheltered homelessnessThe St. Paul City Council adopted an amended plan for responding to unsheltered homelessness, passing it 6-0 with one member absent. The resolution supports a 60-day pause on encampment sweeps, navigation tents, more shelter and a permanent indoor shelter next year, according to a resident’s description. Ramsey County Manager Ling Becker said county participation would require further discussion and county review.Oct 14
- Two Ward 7 properties face $2,928.80 in tree-removal assessmentsThe city is assessing two Ward 7 properties a combined $2,928.80 for removing three green ash trees, park services and assessment administration. The charges are $2,300 for tree removal, $548.80 in park service fees and $80 in administrative fees. The roll lists both assessments as pending as of Aug. 4, 2026.Nov 3
- Hundreds of St. Paul properties face pending public-improvement assessmentsSt. Paul has listed hundreds of properties for public-improvement assessments under project CG26Q2B4. The charges affect properties across Wards 1, 2, 4, 5, 6 and 7, with individual amounts ranging from $19.08 to $621.78. All entries were pending as of July 27, 2026; no ratification date or resolution is provided.Nov 12
- 259 downtown parcels listed for $2.16M public improvement assessmentSt. Paul is assessing $2,163,388.83 for a public improvement project across 259 downtown parcels, including Gallery Tower and properties on Wabasha, Cedar, Exchange, 10th and 12th streets. The roll applies an $866.52 unit rate, with special-benefit caps and prior-assessment reductions lowering the total. No ratification date or approval status is provided.Dec 9
- Public improvement fees listed for hundreds of St. Paul propertiesThe city is preparing a public improvement assessment roll that would charge hundreds of St. Paul property owners fees tied to Project CG26Q2B3. The listed charges cover properties across Wards 3 through 7, with amounts ranging from $11.71 to $559.79. All entries were pending as of July 27, 2026; the source does not provide a ratification date or total.Nov 12
- Hundreds of properties face pending public-improvement feesThe city is preparing to place public-improvement fees on hundreds of St. Paul properties in the CG26Q2B1 assessment roll. Listed charges range from $20.57 to $610.07, including $146.66 at 1749 A St., $293.32 at 197 Annapolis St. E and $586.65 at 998 Grand Ave. All entries are marked pending as of July 27, 2026; no ratification date or resolution number is shown.Nov 12
- Hundreds of St. Paul properties face pending improvement assessmentsSt. Paul is preparing public-improvement assessments for hundreds of properties across Wards 2, 3, 5, 6 and 7. Charges are listed by address, with examples including $266.46 at 1049 7th St. W, $457.55 at 550 Concord St. and $361.88 at 301 Hoyt Ave. E. The charges were pending as of July 27, 2026; the source does not give a ratification date or total.Nov 12
- St. Paul approves $160,000 settlement with Summit Avenue groupSt. Paul will pay Historic Summit Avenue, also known as Save Our Street, $160,000 to settle a lawsuit alleging violations of the Minnesota Government Data Practices Act. The payment reimburses claimed attorneys' fees, and the group will release claims tied to the lawsuit and related data requests. The city will also provide specified public documents about the Summit Avenue Reconstruction Project within five business days of receiving them. The City Council approved the settlement on Oct. 21, with five votes in favor and two members absent.Oct 21
- Council approves 42 Highland Bridge townhome lotsM/I Homes can proceed with platting 42 townhome parcels on 2.13 acres at 966 Mississippi River Boulevard in Highland Bridge. The City Council approved the final plat 7-0 on Oct. 14, 2026, and the mayor’s office signed it Oct. 15. The project creates three blocks, 14 F1 lots, 28 F2 lots and two outlots along Mount Curve Boulevard and Woodlawn Avenue. Construction is expected to start in fall 2026.Oct 14
- Council rejects petition matter after 5,440 signatures verifiedRamsey County verified 392 additional signatures for a Saint Paul petition, bringing the total to 5,440 registered-voter signatures. The City Council rejected the matter on Aug. 5 by a 5-2 vote, with Anika Bowie, Cheniqua Johnson, Molly Coleman, Rebecca Noecker and Saura Jost voting no, and HwaJeong Kim and Nelsie Yang voting yes.Aug 5
- Two property owners assessed $2,928.80 for green ash tree removalsProperty owners at 2255 Conway St. and 2016 Fremont Ave. will be assessed a combined $2,928.80 for removing three diseased or dangerous green ash trees. The charges include $2,300 for tree removal, $548.80 in park service fees and $80 in assessment fees. The City Council adopted the assessment 7-0 on Oct. 14, and the mayor's office signed it the same day.Oct 14