Wellington plans FY 2025 drainage work at canals and neighborhoods
Wellington, FLVillage CouncilFile 24-6773
Wellington’s FY 2025 drainage work includes riprap at several canal locations, culvert and control-structure work, desilting along C-6 Canal, and pipelining near Montauk Drive and Forest Hill Boulevard. The materials identify work areas in Barnstaple Circle, Staghorn and Greenview Shores, Sugar Pond Manor, Wiltshire Village and Avondale Woods. One listed total is $122,130.
AUTHORIZATION TO 1) UTILIZE EXISTING CONTRACTS AND AWARD SOLE SOURCE CONTRACTS, AND 2) APPROVE VARIOUS FY 2025 SURFACE WATER AND ROAD PROJECTS
24-6773: AUTHORIZATION TO 1) UTILIZE EXISTING CONTRACTS AND AWARD SOLE SOURCE CONTRACTS, AND 2) APPROVE VARIOUS FY 2025 SURFACE WATER AND ROAD PROJECTSSource documentPDF 1PDF 2PDF 3PDF 4PDF 5PDF 6PDF 7PDF 8