AssemblyPembroke Pines What Pembroke Pines did.
- Natalie Belmonte wins District 1 Great Yards AwardNatalie Belmonte won the District 1 Great Yards Award for her property at 721 SW 99 Terrace in the Tanglewood neighborhood. Pembroke Pines accepts yard nominations from anyone, but nominated properties must be inside city limits. District 1 awards are scheduled for January, May and September.Sep 17
- Board approves two property variances and postpones two driveway requestsThe Board of Adjustment approved variances for a circular driveway at 17231 SW 12 Street and a walkway at 19467 NW 24 Place. Edgardo Merlano’s driveway variance allows 43% front-lot coverage instead of the 40% limit. Benny Gonzalez’s variance allows a walkway setback as close as 1 foot 9 inches instead of the required 5 feet. Both passed unanimously, with five votes in favor and none opposed. The board postponed Ghassan and May Mourad’s two driveway variances at 979 SW 159 Terrace to Nov. 5, 2026, so they can work with staff to reduce the requests.Sep 22
- 27 students win Fire Prevention Week poster contestThe Fire Prevention Bureau named 27 student winners of its Fire Prevention Week poster contest across kindergarten through eighth grade. Winning posters will be displayed in the Charles F. Dodge City Center lobby, 601 City Center Way, from Oct. 5 through Oct. 8, 2026, during Monday-through-Thursday hours of 7 a.m. to 6 p.m. Winners, their families and teachers are invited to receive awards at the Oct. 7 commission meeting at 6:30 p.m.Sep 23
- $249,800 propane fueling facility contract approved for 901 Poinciana DrivePembroke Pines approved a $249,800 contract with All Florida Contracting Services LLC to install a 5,000-gallon propane autogas tank and dispenser at 901 Poinciana Drive. The facility will connect to the city’s FuelMaster system and support vehicle fueling. The contract includes $24,980 for owner-approved contingency work and allows 120 days for completion after the notice to proceed. The City Commission approved the award 5-0 on Dec. 11, 2025.Dec 11
- $216,155 approved for Southwest Focal Point senior servicesPembroke Pines will receive up to $216,155 for the Southwest Focal Point Senior Center to provide services for Broward County residents age 60 and older from July 1, 2026, through June 30, 2027. Services include transportation, adult day care, caregiver support, counseling, in-home care, recreation and volunteer programs. The City Commission approved the agreement 5-0 on May 20, 2026.May 20
- Fire Rescue gets grant and city match for LIFEPAK 35 monitorPembroke Pines Fire Rescue will receive a LIFEPAK 35 monitor/defibrillator through a Florida Department of Health EMS matching grant. The city approved $19,990.25 in matching funds for the $59,970.75 grant, and Stryker quoted $79,911.49 for the monitor, accessories, data licenses and service. The City Commission approved the grant on Dec. 11, 2025, by a 5-0 vote.Dec 11
- City approves 2028 labor agreement with FOP employeesPembroke Pines approved a new collective bargaining agreement with the Florida State Lodge, Fraternal Order of Police, covering city employees represented by the union through Sept. 30, 2028. The agreement includes 5% merit increases for eligible full-time employees in 2025 and 2026, a 4.5% increase in 2027, part-time pay-range increases, retirement contributions for eligible full-time non-school employees and a $1,000 safe-driving bonus for certain employees with take-home city vehicles. The City Commission approved it 5-0 on Aug. 20, 2025.Aug 20
- Pembroke Pines adopts 5.9197-mill property-tax ratePembroke Pines adopted a 2026-27 property-tax rate of 5.6690 mills for city operations and 0.2507 mills for general-obligation bond debt. The combined rate is 5.9197 mills, 4.54% above the rolled-back operating rate. On the median residential taxable value listed, city taxes are estimated at $1,253.30, up $35.09 from 2025-26. The City Commission approved the rate 4-1 on Sept. 16, with Jay D. Schwartz voting no.Sep 16
- $154,190 tank repair contract approved for Holly Lake EastPembroke Pines approved a $154,190 contract with CROM, LLC, to repair and restore the 2.5-million-gallon Holly Lake East remote water tank at 21800 N 8th Place. The work includes repairs where the tank floor meets the wall and installing an isolation boot. CROM must start within 10 days of the city’s notice to proceed and finish within 60 days. The City Commission approved the contract Dec. 11, 2025, by a 5-0 vote.Dec 11
- Pembroke Pines approves water, sewer service for Southwest Ranches sitePembroke Pines approved a 15-year agreement to provide potable water and wastewater service to property in Southwest Ranches planned for a new industrial development. The city will serve up to 37,000 gallons per day of water and wastewater, with rates and connection charges paid by the customer. The agreement may be assigned to FRP SWR LLC after the property changes ownership. The City Commission approved it Dec. 11, 2025, by a 5-0 vote.Dec 11
- $340,449 access-control purchase approved for city campusesPembroke Pines will spend $340,449.48 with Safeware Inc. for electronic access-control equipment, licenses, cabling, installation labor, permit processing, CAD design and inspections at its Central and East campuses. The City Commission approved the purchase on March 31, 2026, by a 5-0 vote, with all five commissioners voting yes.Mar 31
- Board approves three property makeovers and advances land-use code updatesThe Planning and Zoning Board approved exterior changes for three businesses: Pura Vida at 10590 Pines Boulevard, Shoppes at Pembroke at 11210-11300 Pines Boulevard and Wells Fargo at 12440 Pines Boulevard. The board also sent proposed updates to the city's land development rules to the City Commission with a favorable recommendation. Both actions passed unanimously, with five members voting yes and none voting no.Dec 11
- Building services contract extended through June 30, 2026Pembroke Pines will keep Calvin, Giordano & Associates providing plan reviews, inspections and other building department services for another 180 days, from Jan. 1 through June 30, 2026. The City Manager approved the extension under the city code, and the City Commission later accepted it by consensus. The source does not state a fixed payment; the contract uses permit-revenue sharing, with the city retaining 11.5%.Jan 21
- City approves design work for $1.47M Recreation Center parking lot rebuildThe city approved CPH Consulting’s design services for rebuilding the north parking lot at Pines Recreation Center, 7400 Pines Boulevard. The 174-space lot has ponding and does not meet current accessibility and striping standards. Design, permitting and project management will cost $158,910, while the estimated construction cost is $1,465,227.90. The City Commission approved the action 5-0 on June 17, 2026.Jun 17
- Commission approves $11,030 in Cambridge program fees for two campusesThe City Commission approved two $5,515 Cambridge Primary and Lower Secondary program fees for Pembroke Pines Charter Middle School campuses. The charges cover the 2025-26 school year for the West Campus at 18501 Pembroke Road and the Central Campus at 12350 Sheridan Street. The vote passed 5-0 on Sept. 17, 2025.Sep 17
- Florida alert system contract makes Everbridge service available to Pembroke PinesThe Florida Division of Emergency Management contracted with Everbridge to host and maintain a statewide emergency alert system available to state agencies, universities, counties, cities and other public-alerting entities. The system can send voice calls, texts, emails, social media posts and push notifications, and can connect with federal alert systems. The contract lists annual payments of $2.5 million plus $83,333.33 per month and ran through June 30, 2024. Pembroke Pines is among the local governments eligible to use the system, but the source does not state whether the city ordered service or paid for it. The City Commission approved the matter March 4, 2026, by a 5-0 vote.Mar 4
- City renews landscaping materials contract for up to $500,000Pembroke Pines renewed Blue Marlin Investments Inc., doing business as Cayco Landscaping, for one year to supply trees, plants and other landscaping materials as needed across the city. The renewal runs from Sept. 28, 2024, through Sept. 27, 2025, with expected annual spending capped at $500,000. The City Commission approved the action Aug. 21, 2024, by a 5-0 vote.Aug 21
- Commission renews senior wellness and school photography contractsThe City Commission approved a package of contract actions, including renewing Baptist Health's senior-center wellness programming for one year and renewing Fox-Mar Photography's charter-school services for three years. The city will receive no-cost health programming, while Baptist's class rate rises to $70. The commission also allowed three contracts to expire without renewal: Broward County's community shuttle service, Elan's landscape maintenance, and Hawkins' hydrofluosilicic acid supply agreement. The vote was 5-0.May 20
- City approves $35,000 annual design-services agreement for recreation projectsThe City Commission approved a continuing services agreement with Bermello, Ajamil & Partners, Inc. for as-needed architectural and engineering work for the Recreation and Cultural Arts Department. The city may issue separate statements of work, with annual payments capped at $35,000 unless the commission approves more. The agreement runs through Sept. 30, 2020, with two possible two-year renewals. Commissioners approved it 5-0 on Oct. 3, 2018.Oct 3
- Planning board approves paint, lighting and parking changesThe Planning and Zoning Board approved exterior paint changes for two Wells Fargo branches and the Silver Lakes Center, all without opposition. The board also approved Walmart lighting variances at 12800 Pines Boulevard for online pickup and electric-vehicle charging areas, and granted Oasis Church permission for 224 parking spaces instead of 281. The Oasis Church vote was 3-1; the other listed votes passed unanimously.Mar 12
- Charter school budgets rise by $6.15 million to $81.74 millionPembroke Pines approved a $6.15 million increase to the 2025-26 budgets for its Broward County-sponsored charter schools. The amended combined budget is $81.74 million, up from $75.59 million, covering elementary, middle and AV School funds. Revenue and spending changes include state and federal grants, referendum funds, settlement payments and insurance savings. The City Commission approved the amendment 5-0 on Aug. 19, 2026.Aug 19
- Waste Management gets approval for $70M recycling facility on Pembroke RoadWaste Management received approval to build a 127,304-square-foot recycling facility at 20701 Pembroke Road, replacing part of an undeveloped 21-acre site while keeping the existing recycling operation. The project includes roadway work on SW 208th Avenue, an annual host-fee agreement with the city, and an estimated initial investment of about $70 million. The City Commission approved the site plan June 21, 2023, by a 5-0 vote, subject to conditions including approval of the building's height and continued truck access through US 27.Jun 21
- City approves Building C site work and sewer warranty acceptancePembroke Pines approved the South Florida Distribution Center Building C site improvements after a final inspection found the paving, markings, signage, drainage, water and sewer work compliant with city standards. The city also accepted the installed gravity sewer system for the warranty period, but requires another inspection before releasing the maintenance bond. The City Commission approved the action 5-0 on March 31, 2026.Mar 31
- City approves pool of environmental inspectors for housing hazard checksThe City Commission approved seeking qualified environmental specialists to inspect residential properties for lead and mold hazards and estimate repair costs. The city expects to create a pool of about two or three firms for a two-year term, using HUD CDBG, HOME and SHIP funding. Fees listed are $500 for lead inspections, $650 for mold inspections and $600 for post-mold inspections. The Commission approved the action June 17, 2026, by a 5-0 vote.Jun 17
- City renews parks maintenance contract for up to $6.85 million a yearThe City Commission approved a five-year renewal of Calvin, Giordano and Associates’ parks maintenance contract, effective Oct. 1, 2021, with an annual amount not to exceed $6,845,127. The contractor will maintain city parks, fields, landscaping and irrigation, and provide event support. Staff said the department was satisfied with performance; a report card rated the contractor 93 out of 100.Jan 21
- Commission approves golf shop lease renewal at Pembroke LakesThe City Commission approved renewing the Pembroke Lakes Golf Course golf shop concession lease for the 2009-2010 fiscal year. Golf shop operator Harry S. Ferguson asked to keep the existing payment at 5% of annual gross sales, citing 2008 gross revenue of $125,483 and stagnant expected 2009 sales. The commission approved the matter 5-0.Sep 16
- Commission approves audits and $312,550 FY2026 audit planThe City Commission approved three internal audit assessments covering Waste Pro’s contract, three lobbyist contracts and the proposed FY2026 audit plan. The Waste Pro review found the vendor’s complaint-tracking system was not updated reliably enough to verify 24-hour resolutions; Waste Pro must create a remediation plan and improve same-day updates. The proposed FY2026 plan includes eight projects totaling 1,330 estimated hours and $312,550 at a $235 hourly rate.Oct 15
- Comcast awarded $149,580 charter school internet contractPembroke Pines approved Comcast's three-year internet service contract for its charter schools, with 10 Gbps service at Academic Village and 5 Gbps service at FSU. The service costs $4,155 per month, or $149,580 over 36 months, with no installation charges. The City Commission approved the award 5-0 on March 20, 2024.Mar 20
- $362,437 design package approved for Rose G. Price Park upgradesPembroke Pines approved a $362,437 design package for modernizing Rose G. Price Park at 901 NW 208th Avenue. CPZ Architects and its engineering consultants will design renovations to the community hall and restrooms, five pickleball courts, a 50-yard special-population field, walking paths, parking improvements, landscaping and other upgrades. The City Commission approved the action 5-0 on May 20, 2026. Construction is estimated at $7 million to $8.5 million, but future construction funding has not yet been allocated.May 20
- Commission approves virtual ethics training for city employeesPembroke Pines commissioners approved an every-other-year ethics training plan for city employees, with training also required for new hires. The virtual course would cover state ethics laws, local rules, disclosure and open-government requirements, reporting channels, enforcement and practical scenarios. The City Commission passed it 4-1 on April 15, 2026.Apr 15
- Commission renews eight city contracts, including $700,000 water-meter dealThe City Commission approved renewing eight contracts, including a $700,000 agreement with Ferguson Enterprises for Neptune water meters and system maintenance. Other renewals cover water-treatment chemicals, student behavioral health services, crime-data software, data-center maintenance and senior-center volunteers. The commission approved the recommendations 5-0 on Feb. 19, 2025.Mar 4
- Charter schools approved for $500,729 in student mental-health fundingPembroke Pines Charter Schools will use $500,729 in 2026-27 state mental-health funds for licensed providers serving students at four schools. The plans fund school-based screening, counseling and individual or group therapy through the Student Assistance Program, with services available to students whose parents consent. The City Commission approved the plans 5-0 on April 15, 2026.Apr 15
- City accepts Tuscan Springs improvements for one-year sewer warrantyThe City Commission approved acceptance of Tuscan Springs, also known as Skyrise Plaza, after the Engineering Division found its paving, pavement markings, signage, drainage, water and sewer improvements compliant with city standards. The gravity sewer system is acceptable for now, but it must be inspected again after the one-year warranty period before the city can release the maintenance bond. The commission approved the action 5-0 on March 31, 2026.Mar 31
- City seeks $1.175M to replace four park pavilionsThe city is seeking bids to demolish and replace four aging park pavilions at Pines Recreation Center, two Walnut Creek sites and Flamingo Park. The estimated project cost is $1,175,000, and work is expected to take 180 days after notice to proceed. The City Commission approved moving forward with the solicitation on Dec. 11, 2025, by a 5-0 vote.Dec 11
- Commission approves bidding rules for Silver Lakes North Park renovationsThe City Commission approved bidding requirements for soccer field and structural renovations at Silver Lakes North Park, including insurance, bonding, contractor screening and construction-debris rules. Contractors on projects above $200,000 must provide 5% proposal security and separate payment and performance bonds worth 100% of the contract price. The commission approved the measure 5-0 on Sept. 16, 2026.Sep 16
- $142,560 contract awarded to replace 36 charter-school water fountainsPembroke Pines approved a $142,560 contract with Leonard Graham Inc. d/b/a LGI Construction to replace 36 drinking water fountains with hands-free bottle-filling stations at five charter school campuses. The work covers Academic Village, West Campus, Central Campus, East Campus and FSU Campus, with completion required within 60 days after the city issues a notice to proceed. The City Commission approved the award on Dec. 14, 2022, by a 5-0 vote.Dec 14
- City approves $121,906 Bobcat loader purchaseThe city approved buying one Bobcat T770 compact track loader with a drum mulcher and related equipment for $121,906.42 before applicable taxes. The equipment will be delivered to 8300 South Palm Drive. The City Commission approved the purchase Aug. 19, 2026, by a 5-0 vote.Aug 19
- Commission approves updated engineering standards for city construction workThe City Commission approved updated engineering standards for paving, drainage, water and sewer systems, landscaping and other construction work. The Engineering Division manual guides developers, engineers, contractors and residents working on projects in public rights-of-way, easements and private property. Commissioners approved it 5-0 on Jan. 7, 2026; the source also lists a Dec. 15, 1999 motion and a Jan. 1, 2000 effective date.Jan 7
- City awards $5.4M park operations contract to Calvin, Giordano & AssociatesThe city awarded Calvin, Giordano & Associates a five-year contract to operate, manage, maintain and repair Pembroke Pines park facilities. The contract starts June 1, 2016, and runs through May 31, 2021, with a possible five-year renewal by mutual consent. The first-year service fee is $5,438,550, plus a $100,000 contingency and a $60,000 annual landscaping allowance. City Manager approval placed the contract on the agenda; the official record does not show a commission vote.Apr 20
- Green Facility wins Fire Department cleaning contract for up to $69,438 a yearThe City Commission approved a two-year janitorial services contract with Green Facility Inc. for four Fire Department locations. The city will pay up to $69,438.25 annually, including $5,331.25 for contingency work and $10,794.55 for supplies. Services are scheduled from May 31, 2026, through May 31, 2028, with two possible two-year renewals.May 20
- City approves two gateway signs on Flamingo Road and University DrivePembroke Pines will replace a damaged gateway sign on Flamingo Road and formally authorize an existing sign on University Drive. The City Commission approved amending its agreement with FDOT and accepted responsibility for all design, installation and ongoing maintenance costs. The Flamingo Road sign will be about 12 feet tall, white-LED illuminated and powered by a separate solar panel structure.Jun 17
- City approves $1.41M engineering solicitation for SW 208th AvenuePembroke Pines approved seeking engineering firms to design improvements along SW 208th Avenue from Pines Boulevard to Pembroke Road. The work will study a two-lane roadway, a bypass or bridge near the Fire Training Facility, canal and drainage changes, permits and easements. Staff estimates design services at $1.41 million and construction at $7.99 million. The City Commission approved the action June 3, 2026, by a 5-0 vote; proposals are due July 7.Jun 3
- Medical director agreement extended through 2030 with EMT training dutiesPembroke Pines approved a first amendment with S Katz, Inc. that extends medical director services through Sept. 30, 2030 and adds oversight for the Fire Rescue Department’s EMT training program. When the training program begins, monthly compensation will rise by $524.49 to $4,000, with 3% annual increases. The City Commission approved the amendment 5-0 on Oct. 15, 2025.Oct 15
- Police Department gets three new vehicles for $282,046Pembroke Pines will spend $282,046.32 on three 2026 vehicles for the Police Department: two Chevrolet Silverado 1500 trucks from Hardy Chevrolet for $85,610.32 and one Ford Transit T-350 high-roof cargo van from Duval Ford for $196,436. The City Commission approved the purchase June 17, 2026, by a 5-0 vote. Two 2015 Ford Explorer patrol vehicles, fleet numbers 6642 and 6645, meet replacement criteria.Jun 17
- City approves $350,000 bid for ExaGrid backup hardwarePembroke Pines approved seeking bids to replace end-of-life ExaGrid backup hardware that protects city data and supports recovery. The one-year procurement has an estimated cost of $350,000 and calls for one 432-terabyte raw-capacity system, two 10-gigabit Ethernet options and one year of support. The City Commission approved the solicitation 5-0 on Aug. 5, 2026; bids are due Sept. 8.Aug 5
- City approves $750,000 housing cabinet services poolThe city approved a three-year, as-needed cabinet fabrication and installation pool for its Housing Division, with Cabinet Stop Shop LLC, HRT Construction Group LLC and Kitchen Gallery & Design Inc. The total authorization is up to $750,000, or an estimated $250,000 per year. The City Commission approved the award 10-0 on Dec. 18, 2024.Dec 18
- Good and Hernández win Pembroke Pines commission seatsThomas “Tom” Good won the District 1 City Commission seat and Michael “Mike” Hernández won the District 4 seat in Pembroke Pines’ March 10, 2026, general election. The City Commission adopted the official results on March 18 with five votes in favor. Both commissioners begin four-year terms on March 18.Mar 18
- Pembroke Pines picks Braxton College for in-house paramedic trainingPembroke Pines Fire Rescue selected Braxton College for its in-house paramedic program after reviewing local private programs' tuition and National Registry exam results. Braxton's three-year first-attempt pass rate was 65%, compared with 63% at Coral Springs Regional Institute, while its total tuition was the lowest listed at $8,230. The City Commission approved the selection 5-0 on Dec. 11, 2025.Dec 11
- City approves Bang Energy water capacity and $757,247 connection chargesPembroke Pines approved Vital Pharmaceuticals’ request for reserved water capacity for its Bang Energy operation on roughly 60 acres at 20311, 20351 and 20421 Sheridan Street. The city approved 1,337,986 gallons per day for three phases, including 37,113 gallons per day for the first phase. Phase A-1 water and sewer connection charges total $757,247.06 after a fixture-unit credit. The City Commission approved the request 5-0 on Dec. 16, 2020.Dec 16
- Pembroke Pines adopts 6.0100 millage rate for 2023-24Pembroke Pines adopted a 2023-24 aggregate property-tax millage rate of 6.0100 on Sept. 20, including a 5.6690 operating rate and a 0.3410 debt-service rate. The operating rate is 8.91% above the rolled-back rate of 5.2052. The City Commission passed the measure 5-0 on final approval after a 11-9 first-reading vote.Sep 20