Assembly
Pembroke Pines
Log in
Summaries

Commission approves $6.9M energy upgrades for six charter-school campuses

Pembroke Pines, FLCity CommissionApprovedFile 15-0332

Pembroke Pines approved an energy-savings agreement with BGA Inc. to upgrade lighting, water fixtures, air-conditioning equipment and controls, roofs, and Academic Village pool systems at six charter-school campuses. The work has a maximum cost of $6,895,453, with payments tied to projected energy and operating savings over an 18-year term. The City Commission approved it 5-0 on Oct. 21, 2015.

MOTION TO APPROVE AN ENERGY SAVINGS AGREEMENT BETWEEN BGA, INC. (A CONEDISON SOLUTIONS COMPANY) AND THE CITY OF PEMBROKE PINES WHICH WAS NEGOTIATED WITH ADMINISTRATION FOR ENERGY CONSERVATION MEASURES TO BE INSTALLED AT THE CHARTER SCHOOLS IN THE AMOUNT OF $6,895,453.00 WHICH IS TO BE PAID TO BGA, INC. PLUS INTEREST OVER AN APPROXIMATE 18 YEAR PERIOD UTILIZING THE SAVINGS GENERATED AS A RESULT OF THE ENERGY CONSERVATION MEASURES INSTALLED.

15-0332: MOTION TO APPROVE AN ENERGY SAVINGS AGREEMENT BETWEEN BGA, INC. (A CONEDISON SOLUTIONS COMPANY) AND THE CITY OF PEMBROKE PINES WHICH WAS NEGOTIATED WITH ADMINISTRATION FOR ENERGY CONSERVATION MEASURES TO BE INSTALLED AT THE CHARTER SCHOOLS IN THE AMOUNT OF $6,895,453.00 WHICH IS TO BE PAID TO BGA, INC. PLUS INTEREST OVER AN APPROXIMATE 18 YEAR PERIOD UTILIZING THE SAVINGS GENERATED AS A RESULT OF THE ENERGY CONSERVATION MEASURES INSTALLED.Source documentPDF 1PDF 2PDF 3

On this

Nothing yet. Ask the first question below.