$384,690 Woodscape infrastructure study proposed with Chen Moore

Miramar, FLCity Commission Regular MeetingProposedFile R8729

Miramar plans to award Chen Moore and Associates a contract to study and design improvements for aging water, sewer, lift station and stormwater systems serving Woodscape and nearby residential communities in southwestern Miramar. The study covers about 380 townhomes and single-family homes and will evaluate infrastructure conditions, hydraulic performance, improvement options and preliminary costs. The proposed contract is capped at $284,690, plus a $100,000 contingency, for a total of $384,690. The City Commission is scheduled to consider the award July 8, 2026.

Temp. Reso. #R8729 approving the award of Request for Qualifications, RFQ No. 26-11-01, entitled "Feasibility Study and Professional Engineering Services for the Woodscape Infrastructure Improvements” to the highest most qualified, evaluation scoring, responsive and responsible proposer, Chen Moore and Associates, Inc.; authorizing the City Manager to execute the proposed agreement with Chen Moore and Associates Inc., to provide feasibility study and professional engineering services in an amount not-to-exceed $284,690.00 and a contingency allowance of $100,000.00, for a total amount of $384,690.00. (Utilities Senior Project Manager Eric Francois and Procurement Director Alicia Ayum)

#R8729: Temp. Reso. #R8729 approving the award of Request for Qualifications, RFQ No. 26-11-01, entitled "Feasibility Study and Professional Engineering Services for the Woodscape Infrastructure Improvements” to the highest most qualified, evaluation scoring, responsive and responsible proposer, Chen Moore and Associates, Inc.; authorizing the City Manager to execute the proposed agreement with Chen Moore and Associates Inc., to provide feasibility study and professional engineering services in Source documentPDF

On this

Nothing yet. Ask the first question below.