$49,941 design change proposed for Public Works compound drainage

Hallandale Beach, FLCity CommissionProposedFile 26-150

The City Commission is being asked to approve a $49,941 change order for R.J. Behar & Company to provide additional survey, geotechnical, design, permitting and post-design services for drainage and paving improvements at the Public Works compound. The work would replace a dry retention pond with exfiltration trenches or swales, add paved storage areas along NW 3rd Street and expand drainage planning for the compound. The change would raise the project’s maximum design-services cost to $271,934.83; commissioners are scheduled to consider it May 6, 2026.

A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF HALLANDALE BEACH, FLORIDA AUTHORIZING A CHANGE ORDER TO PROVIDE ADDITIONAL SURVEY, GEOTECHNICAL, DESIGN, PERMITTING, AND POST DESIGN SERVICES FOR THE PUBLIC WORKS COMPOUND PROJECT IN THE AMOUNT OF FORTY-NINE THOUSAND, NINE HUNDRED AND FORTY-ONE DOLLARS ($49,941); AND PROVIDING AN EFFECTIVE DATE. (STAFF: PUBLIC WORKS DIRECTOR)

26-150: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF HALLANDALE BEACH, FLORIDA AUTHORIZING A CHANGE ORDER TO PROVIDE ADDITIONAL SURVEY, GEOTECHNICAL, DESIGN, PERMITTING, AND POST DESIGN SERVICES FOR THE PUBLIC WORKS COMPOUND PROJECT IN THE AMOUNT OF FORTY-NINE THOUSAND, NINE HUNDRED AND FORTY-ONE DOLLARS ($49,941); AND PROVIDING AN EFFECTIVE DATE. (STAFF: PUBLIC WORKS DIRECTOR)Source documentPDF 1PDF 2PDF 3PDF 4PDF 5PDF 6

On this

Nothing yet. Ask the first question below.