Commission to consider $236,867 for force-main construction oversight

Hallandale Beach, FLCity CommissionProposedFile 26-135

The City Commission is scheduled to consider paying AECOM Technical Services up to $236,867 for construction engineering and inspection during the 30-inch wastewater force-main project. The added work would bring AECOM’s project total to $509,305. The roughly 2,800-foot force main runs along NE 14th Avenue from south of Atlantic Shores Boulevard to Hallandale Beach’s master meter in Hollywood. Construction is expected to start June 8, 2026, and finish November 2, 2027.

A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF HALLANDALE BEACH, FLORIDA AUTHORIZING A CHANGE ORDER FOR AECOM TECHNICAL SERVICES, INC., TO PROVIDE CONSTRUCTION ENGINEERING AND INSPECTION SERVICES DURING CONSTRUCTION OF PROJECT P2121 – 30-INCH FORCE MAIN FOR AN ADDITIONAL AMOUNT NOT-TO-EXCEED TWO HUNDRED, THIRTY-SIX THOUSAND, EIGHT HUNDRED AND SIXTY-SEVEN DOLLARS ($236,867), FOR A NEW DESIGN PROJECT TOTAL OF FIVE HUNDRED AND NINE THOUSAND, THREE HUNDRED AND FIVE DOLLARS ($509,305); AND PROVIDING AN EFFECTIVE DATE. (STAFF: PUBLIC WORKS DIRECTOR)

26-135: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF HALLANDALE BEACH, FLORIDA AUTHORIZING A CHANGE ORDER FOR AECOM TECHNICAL SERVICES, INC., TO PROVIDE CONSTRUCTION ENGINEERING AND INSPECTION SERVICES DURING CONSTRUCTION OF PROJECT P2121 – 30-INCH FORCE MAIN FOR AN ADDITIONAL AMOUNT NOT-TO-EXCEED TWO HUNDRED, THIRTY-SIX THOUSAND, EIGHT HUNDRED AND SIXTY-SEVEN DOLLARS ($236,867), FOR A NEW DESIGN PROJECT TOTAL OF FIVE HUNDRED AND NINE THOUSAND, THREE HUNDRED AND FIVE DOLLARS ($50Source documentPDF 1PDF 2PDF 3PDF 4PDF 5PDF 6PDF 7

On this

Nothing yet. Ask the first question below.