AssemblyCoral Gables What Coral Gables did.
- Two attached homes proposed at 10005 and 10015 Snapper Creek RoadRafael Gomara is proposing a two-tract residential replat at 10005 and 10015 Snapper Creek Road. The 0.973-acre site would retain two existing residences and add two two-story single-family attached units, for four residences total. The survey lists the property as single-family residential and says the proposal is a tentative plat; no city approval or vote is stated.Aug 28
- $41,434 approved for Casuarina 2 sewer pump station repairsCoral Gables commissioners approved $41,434.36 for emergency repairs by Stonehenge Construction at the Casuarina 2 sewer pump station. The work will replace deteriorated valve vault piping and fittings after an inspection found risks to system reliability and potential sanitary sewer overflows. The commission passed the measure Aug. 25 with four votes in favor and Commissioner Fernandez absent.Aug 25
- Coral Gables logs 24 applications for homes and property improvementsCoral Gables received 24 building, zoning and architectural applications on June 18 for home repairs, additions, new houses and property improvements. The applications include three new single-family homes, historic-property work, eight Tesla Powerwalls at 7250 Monaco St. and changes to previously approved plans. The source does not state approvals or denials.Jun 18
- 129 Sevilla Ave. building faces unsafe-structure hearing over missed recertificationThe city has declared the office building at 129 Sevilla Ave. unsafe because TFFO LLC did not complete required building recertification. The Construction Regulation Board is scheduled to hear the case Oct. 19, 2026. Staff recommend that the owner submit structural and electrical reports within 30 days, complete recertification within 60 days and face a $250 daily fine if deadlines are missed. The building official may also order evacuation, utility disconnection or demolition under city and county rules.Oct 19
- New storm rules set $500 daily penalties for unsecured roll-off containersCoral Gables adopted rules requiring roll-off waste contractors to empty, remove or secure containers within 24 hours of a tropical storm or hurricane warning or a city request. Violations can cost contractors $500 per container per day, plus the city's cleanup costs, and can block franchise renewal until corrected. The City Commission adopted the ordinance Aug. 25 on a 4-0 vote, with Commissioner Fernandez absent; it passed first reading 5-0 on July 7. Ordinance 2026-31 also requires franchises, monthly revenue reports and insurance coverage for roll-off services using city rights-of-way.Aug 25
- 770 Ponce office building faces unsafe-structure hearingThe city has declared the office building at 770 Ponce de Leon Blvd. unsafe because RRM Prop LTD has not completed required structural and electrical recertification. The Construction Regulation Board is scheduled to hear the case Sept. 14, 2026. Staff recommend that the owner submit signed reports within 30 days, complete recertification within 60 days and face a $250 daily fine if deadlines are missed. The Building Official could also order evacuation, utility disconnection or demolition.Sep 14
- Two Jaguar Parade sculptures approved for Miracle Mile displayCoral Gables approved two painted Jaguar Parade sculptures for temporary display in the 100 block of Miracle Mile from about June 10 through July 20, 2026. Artery will pay for and manage transportation, installation, maintenance, insurance and removal at no cost to the city. The City Commission approved the installation and right-of-way encroachment 5-0, with all commissioners voting yes.May 19
- Andalusia Garage board names officers and funds expenses through city budgetThe Andalusia Garage Condominium Association board appointed five city officials as its directors and officers: Vince Lago as president, Rhonda Anderson as vice president, Melissa Castro as treasurer, and Ariel Fernandez and Richard Lara as secretaries. The board authorized the city manager to manage and maintain the property, sign documents, and use the city budget for operating expenses. The action was adopted Sept. 15, 2026.Sep 15
- Granada Golf Course to continue tee-time blocks for three associationsCoral Gables will continue reserving similar tee-time blocks at Granada Golf Course for current members of three longtime golf associations. City staff will manage the allocations for 60 Granada Golf Association members, 55 Greenway Women’s Golf Association members and 35 Coral Gables Women’s Golf and Bridge Association members, subject to course capacity, seasonal demand, operations and public access. The City Commission approved the measure 5-0 on May 5, 2026.May 5
- Coral Gables confirms two Emergency Management Division appointmentsIbrahim Khalid and Stephen Barrial will serve on Coral Gables' Emergency Management Division through May 31, 2027. The City Commission confirmed both appointments, nominated by Commissioner Lara, on May 19 in a unanimous voice vote with five commissioners voting yes.May 19
- Historic Alhambra Circle home proposed for major addition and new garage1305 Alhambra LLC is seeking approval to demolish the existing detached garage and expand the 1924 one-story home at 1305 Alhambra Circle, a contributing resource in the Alhambra Circle Historic District. The proposal includes about 4,780 square feet of one- and two-story additions, a new detached garage, courtyard, pool and site improvements. The new garage would sit 5 feet from the rear property line instead of the required 10 feet. Historical Resources staff recommends approval with 14 conditions, including preserving historic stucco and studying the entrance and connection to the additions. The Board of Architects approved the design as noted on Aug. 25, 2026; the special certificate and variance remain proposed.Oct 15
- Pilot offers same-day permits for eligible single-family home projectsDevelopment Services is piloting same-day reviews and permits for eligible single-family home projects, including roofing, doors and windows, painting, asphalt driveways and certain small interior work. Applications received before 8 a.m. get same-day review when initial fees are paid; permits can be issued that evening after all trades approve and the customer pays. The pilot began Aug. 10, and staff reported 117 permits processed and 230 reviews completed as of Sept. 3. The City Commission discussed and filed the update Sept. 15.Sep 15
- UM approved for $36,145 sewer connection at indoor practice facilityThe City Commission approved the University of Miami’s outside sewer connection for its indoor practice facility expansion and new weightroom at 5851 San Amaro Drive. The university must pay an estimated $36,145.20 connection fee, provide a maintenance bond equal to 5% of construction costs, maintain required liability insurance and obtain city and county approvals. Commissioners approved the connection March 10, 2026, by a 5-0 vote.Mar 10
- Old Cutler Bay security assessment plan approved for 2026-27Coral Gables approved the next step for collecting security assessments from property owners in the Old Cutler Bay Security Guard Special Taxing District for fiscal year 2026-27. The city estimates $696,800 in security-service costs, with assessments of up to $5,200 per improved lot or unit and $2,600 per vacant lot or unit. A public hearing is set for Sept. 14, 2026, before the assessments are imposed and collected on tax bills.May 19
- Historic board approves additions and gazebo at 1203 Alhambra CircleThe Historic Preservation Board approved additions, exterior changes and sitework at 1203 Alhambra Circle, a contributing home in the Alhambra Circle Historic District. The work includes a 189-square-foot rear addition, a roughly 270-square-foot gazebo, interior remodeling, a garage-to-living-space conversion, pool and driveway changes, and equipment relocation. Approval passed 7-0, with two members excused, subject to 13 conditions covering materials, windows, doors, roof tile, paving and additional details.Sep 17
- City manager authorized to approve Underline right-of-way encroachmentsCoral Gables commissioners voted 5-0 on Sept. 15 to let the city manager review and approve Underline encroachments into city right-of-way, as long as they meet health, safety and welfare standards. The authority covers portions of the trail and amenities such as basketball courts, irrigation, lighting, related infrastructure and the city’s dog park. Future planned amenities will still need commission approval.Sep 15
- Sunrise Harbour security assessment set at $3,900 per improved unitSunrise Harbour property owners will pay annual assessments for enhanced security services during the fiscal year beginning Oct. 1, 2026. The City Commission approved a $374,400 assessment roll, charging $3,900 per improved lot or unit and $1,950 per vacant lot or unit. The commission adopted the measure unanimously, with all five commissioners voting yes.Sep 14
- Board orders repairs and recertifications at four Coral Gables propertiesCoral Gables' Construction Regulation Board ordered owners at four properties to complete repairs or recertification steps, with daily fines for missed deadlines. The board extended the deadline for 600 Biltmore Way by 90 days and imposed a $500 daily fine if the building is not recertified. Three other cases carry $250 daily fines. Three cases were deferred, and one had complied before the hearing.Jul 13
- Septic-to-sewer co-op schedules South Florida neighborhood information sessionGreen Corridor Connection Co-op will hold an information session on Sept. 24, 2026, for residents considering replacing septic systems with County-run sewer service. The grant-funded group offers contractor coordination, competitive bidding, technical support, financing options and property restoration. Neighborhood zones are scheduled to begin in October 2026, January 2027 and April 2027.Aug 25
- Commission defers proposal affecting War Memorial Youth Center improvementsThe City Commission deferred a proposal to let the city manager move ahead with major Coral Gables War Memorial Youth Center improvements that could temporarily close the facility. The proposal would also keep the city attorney’s pause on litigation efforts. Commissioners deferred the matter on July 7, Aug. 25 and Sept. 15, 2026.Sep 16
- Police ballistic plate purchase approved for up to $95,000Coral Gables will spend an estimated $95,000 in fiscal years 2026 and 2027 on Marrero Armor ballistic plates for police officers. Tactical Edge Consulting will supply the plates through a sole-source purchase because it is the authorized representative for Marrero Armor. The City Commission approved the purchase July 7, 2026, in a unanimous voice vote, with five commissioners voting yes.Jul 7
- 730 Coral Way condo faces hearing over missed safety recertificationCoral Gables has scheduled a Construction Regulation Board hearing for the 11-unit Greenways condominium at 730 Coral Way after the owner failed to complete required structural and electrical recertification. Staff recommend that the association submit signed reports within 30 days, complete recertification within 60 days and face a $250 daily fine if deadlines are missed. The hearing is set for Oct. 19, 2026, at 2 p.m.Oct 19
- Commission rejects proposed Coral Gables-Bal Harbour promotion partnershipCoral Gables commissioners rejected a proposed economic development partnership with Bal Harbour that would have promoted each municipality’s business districts, restaurants, cultural institutions, retail destinations and community events. Commissioner Castro sponsored the proposal. The commission voted 4-1 against it on July 7, with Castro the only yes vote.Jul 7
- City extends GPE contract for right-of-way projects through March 2027The City Commission approved a six-month extension for GPE Engineering & General Contractor Corp. to finish ongoing citywide right-of-way improvement projects. The contract now runs through March 15, 2027; the original estimated annual amount was $1.2 million. Commissioners approved the extension 4-0, with Commissioner Fernandez absent.Aug 25
- Jose Riera confirmed for Budget Audit Advisory BoardJose Riera will serve on Coral Gables' Budget Audit Advisory Board through May 31, 2027. The City Commission confirmed Commissioner Lara's nomination on Aug. 25, with four commissioners voting yes and Commissioner Fernandez absent.Aug 25
- Merrick House reports 153 April visitors and $434 in receiptsMerrick House recorded 153 visitors in April 2026, including 112 people at its spring open house and 10 visitors with the Institute for Classical Art and Architecture. The house closed on Easter Sunday and underwent termite extermination work on April 10. Receipts totaled $434, including sales, a raffle, donations and paid visits.May 11
- George Kakouris appointed to Coral Gables Code Enforcement BoardGeorge Kakouris was appointed to Coral Gables' Code Enforcement Board for a three-year term beginning June 1, 2026, and ending May 31, 2029. The City Commission approved the appointment unanimously, 5-0, with all five commissioners voting yes.May 19
- Pinewood board outlines cemetery restoration priorities and $125K-$145K planning proposalThe Pinewood Cemetery Advisory Board discussed priorities for restoring the cemetery, including tree removal, safer and more accessible paths, drainage, grave mapping and monument preservation. City staff said a project team is in place and a landscape architect’s preliminary assessment and design proposal would cost about $125,000 to $145,000, before tree removal. About 15 north-side trees were identified for possible immediate removal. The board will refine and rank its priorities before adopting a formal list at a future meeting.Sep 22
- Pinewood Cemetery board develops restoration plan for historic siteThe Pinewood Cemetery Advisory Board is developing recommendations for a restoration plan for the four-acre historic cemetery on Erwin Road. The plan would address invasive vegetation, damaged or missing headstones and other site conditions before going to the Commission for review and approval. Volunteers have held six cleanups, removing more than 22,000 pounds of invasive plants, and a survey found more than 770 trees, including 70 large Australian pines.Apr 21
- Five firms approved for Coral Gables landscape design consultingThe City Commission approved a pool of five firms to provide landscape architectural consulting services on an as-needed basis: Calvin, Giordano & Associates, Kimley-Horn and Associates, Landscape DE, Miller, Legg & Associates, and Savino Miller Design Studio. Agreements will cover an initial three-year term with two optional one-year renewals. Work will be assigned through individual task orders using already approved project budgets; no additional appropriation is required.Feb 24
- Development Services adds permit tools and AI call routingCoral Gables Development Services has added tools and process changes for permit applicants, contractors and inspection customers. The department launched an inspection queue tracker, automated permit extensions and online contractor registration, and is launching an AI voice agent on May 6, 2026, for basic questions and call routing. Staff say the average time from application submission to first review fell from 4.16 days in September 2025 to 1.49 days in March 2026. More than 700 contractor registrations or updates have been processed since March 16, 2026.May 5
- Coral Gables approves 226,193-square-foot Crystal Residences projectCoral Gables approved the Crystal Residences project at 110 Phoenetia Avenue, allowing a nine-story mixed-use development with 184 residential units, 16 live-work units and space for Crystal Academy. The project includes 301 parking spaces, 31.6% on-site open space, publicly accessible park and courtyard areas, and traffic, landscaping and pedestrian improvements. The City Commission adopted the planned area development on Aug. 25 by a 3-1 vote, with Commissioner Fernandez absent and Commissioner Castro opposed. The approval requires the applicant to provide about 6,700 square feet for Crystal Academy rent-free for 99 years and limits school enrollment to 75 students.Aug 25
- Historic board approves addition and carport at 1137 Obispo AvenueWarren and Penelope Wior received approval to add 764 square feet to their historic home at 1137 Obispo Avenue, build a 231-square-foot porte cochere, restore the carriage house and make interior and site changes. The Historic Preservation Board also approved variances for a 3-foot west setback and a 4-foot-7-inch east setback, where 5 feet is required. Approval passed 7-0, with two members excused, and includes 10 staff conditions covering windows, stucco, roof tile, balcony details and other historic features.Aug 13
- Police renew SaferWatch service for $142,500 over three yearsCoral Gables will continue using SaferWatch for three years so residents can upload media and stream live video to the Police Department’s Communication Center and law enforcement agencies. The city will waive competitive bidding and spend an estimated $142,500, or $47,500 annually. The City Commission approved the agreement May 5 in a unanimous 5-0 vote.May 5
- 301-341 Madeira developer will pay $300,000 instead of burying Salzedo utilitiesUrban 301 Madeira LLC no longer must bury utilities along about 650 feet of Salzedo Street for the 301-341 Madeira multifamily project. Instead, the developer must pay Coral Gables $300,000 before the first certificate of occupancy or temporary certificate of occupancy. The City Commission adopted the change unanimously, 5-0, on Sept. 15, 2026; all other project conditions remain unchanged.Aug 25
- Restoration plan outlines repairs and habitat work at Pinewood CemeteryA Pinewood Cemetery restoration plan identifies 34 general actions and 19 specific north- and south-side projects. The proposed work includes repairing graves, removing invasive trees, restoring native habitat, adding markers and maps, improving paths and parking, and correcting signs. The source does not state a vote, funding amount or approval status.Sep 22
- Lago appointed to auditor selection committee, Lara named alternateMayor Vince Lago will serve on the auditor selection committee for the city's upcoming external auditing services bid, with Commissioner Richard D. Lara as his alternate. The City Commission adopted the appointments unanimously, 5-0, on May 19, 2026. The city expects to advertise the request for proposals by the end of May and hold an evaluation committee meeting in July or August.May 19
- Board approves cooling-tower variances for Gables Club at 10 Edgewater DriveThe Board of Adjustment approved two variances for The Gables Club Association at 10 Edgewater Drive to build a cooling-tower enclosure for its two residential towers. The roughly 25-foot structure will sit about 43 feet 6 inches from the front property line, closer to Edgewater Drive than the main buildings, and will have street-facing louvers. The board approved the request July 6 by a 6-0 vote.Jul 6
- Historic board approves 1139 Venetia Avenue home renovation and variancesOwners Habib Jose Fadel and Ana S. Garcia received approval to renovate and expand their 1925 Mediterranean Revival home at 1139 Venetia Avenue. The Historic Preservation Board approved additions, alterations and sitework, plus variances for a driveway that does not access covered parking and a three-foot separation between the addition and garage. The board approved the request April 23, 2026, by a 6-0 vote, with three members absent.Apr 23
- Coral Gables approves $50,000 change to Morel Doucet sculptureCoral Gables commissioners approved a design change for artist Morel Doucet’s sculpture “Secrets That The Wind Carries Away.” The raised concrete base will receive a sculptural plate designed with a water effect. The city will transfer and spend $50,000 from the Art in Public Places fund for the revised design and materials. The commission approved the measure Aug. 25, with four members voting yes and Commissioner Fernandez absent.Aug 25
- Coral Gables will deny new permits to contractors with expired permitsCoral Gables commissioners voted 5-0 to direct city staff to deny new building permits to contractors who have expired permits in the city. The policy took effect Feb. 24, 2026, while the building official may still require permit reactivation, allow a contractor change or approve a permit in special circumstances.Feb 24
- Historic board approves 708-square-foot addition at 808 Majorca AvenueThe Historic Preservation Board approved Juan Arce’s plans to add about 708 square feet to the one-story historic home at 808 Majorca Avenue, remodel the residence and expand the pool deck. The approval allows the home and addition to remain entirely flat-roofed through a zoning variance. Work must follow 11 design conditions, including changes to windows, stucco, coping and parapet details. The board approved the application June 18 by a 7-0 vote, with two members excused.Jun 18
- Coral Gables adopts recurring funding rules for capital projectsCoral Gables adopted rules requiring ongoing funding for facility, technology and priority capital projects. The city must direct at least 85% of Capital Matrices funding from recurring General Fund revenue, unless taxable property values fall, after existing operating costs are covered. It also must target at least $2 million annually for priority capital projects, subject to the same conditions. The City Commission adopted the ordinance Feb. 10 by a 4-0 vote, with Commissioner Fernandez absent.Feb 10
- Riviera tennis facility approved for outside sewer connectionThe City Commission approved an outside sewer connection for Riviera Country Club’s proposed tennis facility at 1155 Blue Road. The property is outside the city’s sewer district and will connect through an existing 6-inch force main along Blue Road. Riviera Country Club must pay an estimated $51,543.24 connection fee, provide a surety bond equal to 5% of construction costs, carry liability insurance and secure required approvals and permits. Commissioners approved the action 5-0 on April 14, 2026.Apr 14
- Regency Parc may get occupancy certificates before park completionRegency Parc can receive temporary certificates of occupancy before completing and conveying its public park, after the City Commission approved an amendment requiring $622,000 in security. The 10,000-square-foot park at 2701 Salzedo Street must be completed and conveyed to the city within one year of the temporary certificate, and the deed will be held in escrow until then. Commissioners approved the change 5-0 on May 5, 2026, after first approving it 5-0 on April 14.Apr 14
- Coral Gables voters will decide on four-year mayoral termsCoral Gables voters will decide Nov. 3 whether to change the mayor’s term from two years to four years, starting with the 2028 general election. The change would not extend the eight-year consecutive term limit. The City Commission approved placing the question on the ballot in a unanimous 5-0 vote, with all five commissioners voting yes.Jul 7
- University of Miami proposes new Rodriguez Park batter’s eye buildingThe University of Miami is seeking Level Two Development Review Committee review for a new batter’s eye and support building at Rodriguez Park, 5685 Ponce de Leon Blvd. The project would replace the existing metal batter’s eye with a storage building, restroom, mezzanine and camera platforms. Plans show 4,790 square feet of storage space, a 34-foot height and an estimated occupancy of 18 people. The AECOM submission is proposed for administrative and technical review; DRC review would not approve the project.Apr 24
- Pinewood board weighs $125K-$145K restoration planning proposalThe Pinewood Cemetery Advisory Board discussed restoration priorities, including safer walking paths, accessible areas, tree management, grave mapping and historic monument preservation. City staff reported that a project team is assembled and that a landscape architect’s assessment and planning proposal would cost about $125,000 to $145,000, before tree-removal costs. About 15 north-side trees may need immediate removal, while other invasive trees would be addressed in phases. The board approved corrected minutes unanimously and will refine its restoration priorities at a future meeting.Sep 22
- City approves up to $25M reimbursement framework for City Hall renovationCoral Gables will begin renovating and restoring its current City Hall and may use up to $25 million in future tax-exempt financing to reimburse early project costs. The City Commission approved the financing framework July 7, 2026, by a unanimous 5-0 vote. The $25 million is not the final project budget or bond size; staff say it allows design and preconstruction work to begin while final pricing and financing are completed.Jul 7
- Board extends repair deadlines and imposes fines at Coral Gables propertiesThe Construction Regulation Board approved extensions and enforcement steps for five properties, including a six-month repair extension at 1129 Sevilla Ave. and a Sept. 30, 2026, recertification deadline at 280 Alhambra Circle. At 222 Phoenetia Ave., fines of $250 per day continue retroactively, with a possible $500 daily fine if the owner misses new requirements or recertification. The board also extended deadlines at 1500 Douglas Road, 1 Alhambra Plaza and 20 Santillane Ave.; it deferred one new case and took no action on public-safety radio certification.Aug 10